Private
Public Access
0
0
Files
manual_slop/conductor/tracks
ed 7c3052c893 conductor(archive): ship phase2_4_5_call_site_completion_20260621 (4 phases + report)
Updates:
- conductor/tracks.md: entry #27 marked SHIPPED 2026-06-21; BLOCKER
  removed for code_path_audit_20260607 (broadcast() TypeError fixed)
- state.toml: status=completed, current_phase=6, all 4 phases marked
  completed with checkpoint SHAs, all verification booleans true

NOT shipped (per user instruction):
- The git mv to conductor/tracks/archive/ is the USER's responsibility
- Track directory stays at conductor/tracks/phase2_4_5_call_site_completion_20260621/
- tier2/any_type_componentization_20260621 branch NOT merged (reconnaissance framing)
2026-06-21 20:00:11 -04:00
..
2026-06-17 01:57:52 -04:00