Private
Public Access
conductor(plan): rewrite chronology_20260619 plan for v2 (11 phases, 4 pause points)
Replaces the v1 plan (10 phases, single-stage cross-check) with an 11-phase plan that executes the v2 spec's git-history classifier + 3-stage cross-check + 30% quality gate. Plan Phase 2 = Spec Phase 2 part 1; renumbering shifts from Plan Phase 4 onwards (per the spec-vs-plan mapping in the summary table). 11 phases, 28 tasks, 4 hard pause points (Plan Phase 6 quality gate, Plan Phase 7 Tier 1 review, Plan Phase 10 user sign-off, plus the Plan Phase 6 ABORT fallback to manual review). TDD red+green cycles for Phases 2-4 (8 new tests for _classify_status + 4 for extract_summary + 3 for format_markdown + 5 for the quality gate). Test runner: scripts/run_tests_batched.py (per Tier 2 sandbox rule #1). Throw-away scripts: scripts/tier2/artifacts/chronology_20260619/ (rule #4). Default branch: master (rule #2). Line endings: preserve existing (rule #3).
This commit is contained in: