ed
0ad67cef1e
conductor(plan): Mark task 5.6 complete
2026-06-17 19:16:20 -04:00
ed
9dc9c61d40
conductor(plan): Mark Phase 5 complete (all 7 tasks)
2026-06-17 19:16:11 -04:00
ed
a48acb3f85
conductor(plan): Mark tasks 4.2, 4.3, 4.6 complete
2026-06-17 19:13:28 -04:00
ed
2d880b849e
conductor(plan): Mark Phase 4 complete (all 6 tasks)
2026-06-17 19:13:12 -04:00
ed
e0ffe7b6e6
conductor(plan): Mark tasks 3.5 + 3.6 (startup_profiler + project_manager) complete
2026-06-17 19:11:46 -04:00
ed
f0b7df816a
conductor(plan): Mark task 3.3 (log_registry migration) complete
2026-06-17 19:10:24 -04:00
ed
4b05ecc792
conductor(plan): Mark Phase 3 docs-only tasks complete (3.2, 3.4, 3.7)
2026-06-17 19:08:40 -04:00
ed
9d9732e13f
conductor(plan): Mark task 3.1 (summary_cache migration) complete
2026-06-17 19:07:24 -04:00
ed
b1abdaf641
conductor(plan): Mark task 2.1.5 (audit heuristic followup) complete
2026-06-17 18:59:31 -04:00
ed
445c77dff0
conductor(plan): Mark Phase 2 (4 UNCLEAR classifications) complete
2026-06-17 18:59:24 -04:00
ed
b94dd85f14
conductor(plan): Mark phase 1 verification complete
2026-06-17 18:57:04 -04:00
ed
9cdb2edea6
conductor(plan): Mark task 1.3.3 complete
2026-06-17 18:56:30 -04:00
ed
3c13fd718f
conductor(plan): Mark task 1.3.1-1.3.3 (truncation fix) complete
2026-06-17 18:56:22 -04:00
ed
373783dedc
conductor(plan): Mark task 1.2.3 complete
2026-06-17 18:55:12 -04:00
ed
7c819017d2
conductor(plan): Mark task 1.2.1-1.2.3 (render_json filter fix) complete
2026-06-17 18:55:06 -04:00
ed
241f5b46ff
conductor(plan): Mark task 1.1.1-1.1.3 (visit_Try walker fix) complete
2026-06-17 18:53:44 -04:00
ed
cf3c20d7df
docs(track): update result_migration_20260616 umbrella with sub-track 4 +1 site (src/gui_2.py:1349)
2026-06-17 18:22:25 -04:00
ed
5c4244077c
conductor(track): metadata + state for result_migration_small_files_20260617
2026-06-17 18:20:24 -04:00
ed
9f9fcf93e1
conductor(track): plan for result_migration_small_files_20260617
2026-06-17 18:20:06 -04:00
ed
0aa00e394d
conductor(track): spec for result_migration_small_files_20260617 (sub-track 2 of 5)
2026-06-17 18:19:42 -04:00
ed
3347926717
conductor(track): mark result_migration_review_pass_20260617 as completed (all 22 tasks done; all 11 test tiers PASS)
2026-06-17 16:58:19 -04:00
ed
a6d00f0057
conductor(plan): mark t6_1 and t6_2 complete (audit verified, all 11 test tiers PASS)
2026-06-17 16:55:54 -04:00
ed
428ff64de9
conductor(plan): mark Phase 5 complete (report written + umbrella spec updated)
2026-06-17 16:21:27 -04:00
ed
a152903871
docs(track): update result_migration_20260616 with post-review scope (sub-track 4 gains 1 site; all others unchanged)
2026-06-17 16:20:04 -04:00
ed
662b6e8aba
conductor(plan): mark Phase 4 complete (10 heuristics added; UNCLEAR 24->3 in review scope)
2026-06-17 16:17:02 -04:00
ed
8b954ee180
conductor(plan): mark Phase 3 complete (19 INTERNAL_RETHROW sites classified: 7 PATTERN_1 + 2 PATTERN_2 + 9 compliant + 0 migration-target)
2026-06-17 15:57:33 -04:00
ed
af47b3eaa2
conductor(plan): mark t3_6 complete (src/models.py INTERNAL_RETHROW review)
2026-06-17 15:55:44 -04:00
ed
306895f667
conductor(plan): mark t3_5 complete (src/api_hooks.py INTERNAL_RETHROW review)
2026-06-17 15:54:44 -04:00
ed
e3600545bf
conductor(plan): mark t3_4 complete (src/gui_2.py INTERNAL_RETHROW review)
2026-06-17 15:53:37 -04:00
ed
443946f8b3
conductor(plan): mark t3_3 complete (src/app_controller.py INTERNAL_RETHROW review); add rethrow_sites_compliant metric
2026-06-17 15:52:36 -04:00
ed
51a45099ef
conductor(plan): mark t3_2 complete (src/rag_engine.py INTERNAL_RETHROW review)
2026-06-17 15:51:19 -04:00
ed
7804ebd015
conductor(plan): mark t3_1 complete (src/ai_client.py INTERNAL_RETHROW review)
2026-06-17 15:15:10 -04:00
ed
2b34b8fc11
conductor(plan): mark Phase 2 complete (24 UNCLEAR sites reviewed: 23 compliant + 1 migration-target)
2026-06-17 15:12:29 -04:00
ed
31a40dd9c6
conductor(plan): mark t2_5 complete (src/models.py UNCLEAR review)
2026-06-17 15:10:57 -04:00
ed
3119d90170
conductor(plan): mark t2_4 complete (src/app_controller.py UNCLEAR review)
2026-06-17 15:09:57 -04:00
ed
f71af2febe
conductor(plan): mark t2_3 complete (src/ai_client.py UNCLEAR review)
2026-06-17 15:08:55 -04:00
ed
91b3337a18
conductor(plan): mark t2_2 complete (src/mcp_client.py UNCLEAR review)
2026-06-17 15:07:32 -04:00
ed
f94d77eab8
conductor(plan): mark t2_1 complete (src/gui_2.py UNCLEAR review)
2026-06-17 15:05:58 -04:00
ed
bd13bd7d06
conductor(plan): mark Phase 1 setup tasks complete (t1_1, t1_2)
2026-06-17 15:02:45 -04:00
ed
396eb82c1a
conductor(track): init result_migration_review_pass_20260617 (sub-track 1 of 5)
...
Sub-track 1 of the 5-sub-track result_migration_20260616 campaign.
Audit-driven research task: classify 43 ambiguous exception-handling sites
(24 UNCLEAR + 19 INTERNAL_RETHROW across 11 files) and update the
audit script's heuristics. No production code change.
Scope: 11 files, 43 sites, T-shirt S. The per-site decisions feed
sub-tracks 2-4 (small_files, app_controller, gui_2) as their starting
migration scope.
Files: spec.md, plan.md, metadata.json, state.toml under
conductor/tracks/result_migration_review_pass_20260617/. Row added
to conductor/tracks.md.
2026-06-17 14:45:52 -04:00
ed
86fc1c5477
Merge branch 'master' of C:\projects\manual_slop into tier2/send_result_to_send_20260616
2026-06-17 02:00:56 -04:00
ed
e2e570369e
wrong folder
2026-06-17 01:57:52 -04:00
ed
1fc4a6026b
plan update for (send_result-to_send)
2026-06-17 01:54:52 -04:00
ed
959ea38b87
conductor(track): fable_review_20260617 metadata — point to plan.md
...
Plan committed at 8ec6d8f4 (1010 lines, 7 phases, 50+ tasks).
2026-06-17 01:41:58 -04:00
ed
8ec6d8f4a6
conductor(plan): Add fable_review_20260617 plan
...
7 phases, 50+ bite-sized tasks. Phase 1: init + 4 skeleton files. Phase 2: 10 parallel Tier 3 cluster sub-agent dispatches. Phase 3: 17 synthesis sections (Tier 1 max-token-output strategy). Phase 4: 3 side artifacts. Phase 5: self-review. Phase 6: user review. Phase 7: final commit + register. Every task has a verification command. Fable artifact at docs/artifacts/Fable System Prompt.txt is NEVER staged (verified per-task). No day estimates (per conductor/workflow.md §Tier 1 Track Initialization Rules).
2026-06-17 01:41:42 -04:00
ed
c0e2051ec9
conductor(plan): Mark Phase 6 complete - all track tasks done
...
Phase 6 tasks (t6_1, t6_2, t6_3) and the phase itself marked completed.
All 16 task entries now have status=completed.
All 6 phase entries now have status=completed.
This is the final state.toml commit for the track.
2026-06-17 01:18:40 -04:00
ed
5a58e1ceaf
conductor(plan): Mark Task 6.2 complete - metadata.json to status=shipped
...
Track marked shipped 2026-06-17. All 6 verification criteria evaluated
with PASS/EXCEEDED/READY status and notes. 7 pre-existing test failures
documented with root cause and pre_existing_failures_remaining flag.
Risk register updated: scope_creep=none, behavior_change=none,
doc_drift=medium (error_handling.md deprecation section required
surgical rewrite to historical note).
No deferred_to_followup_tracks (this track completed cleanly).
2026-06-17 01:16:43 -04:00
ed
a6114ef9ac
conductor(track): Add fable_review_20260617 state.toml
...
7 phases (init -> 10 parallel cluster dispatches -> 17 synthesis sections -> 3 side artifacts -> self-review -> user review -> register). Each phase has explicit task IDs (t1_1 .. t7_4) for Tier 2 to walk through. current_phase = 0 (spec approved, not started). Hard rule encoded in [meta]: docs/artifacts/Fable System Prompt.txt is NEVER committed.
2026-06-17 01:16:20 -04:00
ed
058e2c9385
conductor(track): Add fable_review_20260617 spec + metadata
...
Critical-analysis track for Anthropic's Claude Fable 5 system prompt (1585 lines, the public 'Mythos' version). 10 cluster sub-reports written by Tier 3 workers in parallel, synthesized by Tier 1 into a 17-section report (>3500 LOC) with 3 side artifacts. T-shirt size: XL. Fable artifact at docs/artifacts/Fable System Prompt.txt is local-only and MUST NOT be committed (per user hard rule). No day estimates (per conductor/workflow.md §Tier 1 Track Initialization Rules).
2026-06-17 01:15:58 -04:00
ed
aad6deffcb
conductor(plan): Mark Task 6.1 complete - state.toml updated
...
All 16 task entries now have status=completed and commit_sha.
All 6 phases marked completed (phase_6 in_progress pending metadata+tracks.md).
All 9 verification flags = true.
All 6 enforcement_stack flags = true (sandbox contracts exercised).
Added [notes] section documenting:
- Phase 4 file count discrepancy (22 actual vs 24 spec)
- error_handling.md deprecation section replacement
- Pre-existing test failures (unrelated to track)
- MCP edit_file unreliability + Python fallback
2026-06-17 01:15:33 -04:00