Phase 6 tasks (t6_1, t6_2, t6_3) and the phase itself marked completed.
All 16 task entries now have status=completed.
All 6 phase entries now have status=completed.
This is the final state.toml commit for the track.
Track marked shipped 2026-06-17. All 6 verification criteria evaluated
with PASS/EXCEEDED/READY status and notes. 7 pre-existing test failures
documented with root cause and pre_existing_failures_remaining flag.
Risk register updated: scope_creep=none, behavior_change=none,
doc_drift=medium (error_handling.md deprecation section required
surgical rewrite to historical note).
No deferred_to_followup_tracks (this track completed cleanly).
Final grep: 0 send_result in active code. 3 historical refs in
error_handling.md (intentional, in the 'Historical deprecation' note).
Test verification: 100/101 tests pass in the 26 files renamed by this
track. 1 pre-existing failure in test_headless_service.py due to
missing credentials.toml (verified against origin/master baseline
where it also fails - unrelated to the rename).
The first end-to-end test of the tier2_autonomous_sandbox_20260616
sandbox. Pure mechanical rename: ai_client.send_result to ai_client.send
across 38 active files (6 src/, 29 tests/, 3 current docs). 10 atomic
commits across 5 phases. No behavior change; no new tests; the existing
test suite is the safety net.
Phase structure:
- Phase 1: rename src/ai_client.py (TDD red moment)
- Phase 2: rename 5 other src/ files (batch)
- Phase 3: rename top 5 test files (one commit per file)
- Phase 4: rename 24 remaining test files (batch)
- Phase 5: rename 3 current docs + final verification
- Phase 6: update state + metadata + register in tracks.md
Historical archives (conductor/tracks/*/spec.md, conductor/tracks/*/plan.md,
docs/reports/*) are NOT modified per spec section 7.