8a1e2ecc9e
Track closed per user direction with PARTIAL completion (17 of 31 tasks done; 13 deferred to followup tracks). TRACK_COMPLETION_test_suite_cleanup_gemini_cli_removal_20260705.md records the 12-VC status (7 PASS, 5 NOT DONE / NOT VERIFIED), the phase-by-phase breakdown, branch state, risks, and hand-off notes. conductor/chronology.md: Active row updated to 'Partially Completed' with the commit range + summary of completed/deferred work. state.toml: status = 'superseded'; current_phase kept at 1 (mid-Phase 1) to reflect actual stopping point; new [followup_tracks] section records the two upcoming tracks: - vendor_ai_client_track (Front C metadata work) - test_de_crufting_track (Front B cruft work)