conductor(plan): Mark Task 4.1 complete (track SHIPPED)
This commit is contained in:
@@ -57,7 +57,7 @@ Focus: Replace the non-deterministic toggle with a deterministic close path.
|
|||||||
|
|
||||||
Focus: Confirm all 10 verification criteria pass.
|
Focus: Confirm all 10 verification criteria pass.
|
||||||
|
|
||||||
- [ ] Task 4.1: Run all 6 VCs; write the track's end-of-track report.
|
- [x] Task 4.1: Run all 6 VCs; write the track's end-of-track report. [885bc1be]
|
||||||
- WHERE: Full test suite + audit gates
|
- WHERE: Full test suite + audit gates
|
||||||
- WHAT:
|
- WHAT:
|
||||||
- Run VC1-VC6 (the 6 verification criteria from the spec)
|
- Run VC1-VC6 (the 6 verification criteria from the spec)
|
||||||
|
|||||||
Reference in New Issue