conductor(plan): Mark Task 4.1 complete (track SHIPPED)

This commit is contained in:
2026-06-24 11:33:58 -04:00
parent 241e619061
commit f776cc6bc6
@@ -57,7 +57,7 @@ Focus: Replace the non-deterministic toggle with a deterministic close path.
Focus: Confirm all 10 verification criteria pass.
- [ ] Task 4.1: Run all 6 VCs; write the track's end-of-track report.
- [x] Task 4.1: Run all 6 VCs; write the track's end-of-track report. [885bc1be]
- WHERE: Full test suite + audit gates
- WHAT:
- Run VC1-VC6 (the 6 verification criteria from the spec)