conductor(plan): set current_phase=4; resuming follow-up after compaction
Phase 3 is complete (7 of 8 UX adaptations shipped; t3_7 moved to Phase 4). Resuming Phase 4: local-first + matrix v2.
This commit is contained in:
@@ -5,7 +5,7 @@
|
||||
track_id = "qwen_llama_grok_followup_20260611"
|
||||
name = "Qwen/Llama/Grok Follow-Up (tool loop, PROVIDERS move, UX adaptations 2-9, local-first, matrix v2, Anthropic/Gemini/DeepSeek migration)"
|
||||
status = "active"
|
||||
current_phase = 1
|
||||
current_phase = 4
|
||||
last_updated = "2026-06-11"
|
||||
|
||||
[blocked_by]
|
||||
|
||||
Reference in New Issue
Block a user