Private
Public Access
0
0

conductor(deob_pass3): mark all 3 phases complete; awaiting user review for status=completed

This commit is contained in:
Tier 2 Tech Lead
2026-06-23 21:11:02 -04:00
parent c1f0ee9ac3
commit d2ee7f2bea
@@ -5,7 +5,7 @@
track_id = "video_analysis_deob_pass3_20260623"
name = "Pass 3 - C11/Python Projection (the final phase of the 3-pass research campaign)"
status = "active"
current_phase = 1
current_phase = "complete"
last_updated = "2026-06-23"
[blocked_by]
@@ -18,9 +18,9 @@ video_analysis_deob_c11_reference_20260623 = "shipped 2026-06-23 (5f6e8423)"
# (end of the 3-pass research campaign)
[phases]
phase_1 = { status = "pending", checkpointsha = "", name = "Tier 2 reads the 4 PRIMARY inputs" }
phase_2 = { status = "pending", checkpointsha = "", name = "Tier 2 dispatches 4 parallel Tier 3 sub-agents (per cluster)" }
phase_3 = { status = "pending", checkpointsha = "", name = "Tier 2 synthesizes the per-cluster outputs" }
phase_1 = { status = "completed", checkpointsha = "", name = "Tier 2 reads the 4 PRIMARY inputs" }
phase_2 = { status = "completed", checkpointsha = "", name = "Tier 2 dispatches 4 parallel Tier 3 sub-agents (per cluster)" }
phase_3 = { status = "completed", checkpointsha = "", name = "Tier 2 synthesizes the per-cluster outputs" }
[tasks]
# Phase 1 (read inputs)