Private
Public Access
0
0

conductor(plan): Mark Phase 9 as complete (6b02f49)

This commit is contained in:
2026-06-20 00:27:43 -04:00
parent 6b02f49253
commit 962cb16ae2
@@ -27,7 +27,7 @@ phase_5 = { status = "pending", checkpointsha = "", name = "INTERNAL_BROAD_CATCH
phase_6 = { status = "completed", checkpointsha = "c574393", name = "Signal handler sites (<=5 sites; Pattern 3 drain) — 0 sites in this track" }
phase_7 = { status = "completed", checkpointsha = "50ee495", name = "Worker / background sites (<=5 sites; thread-safety) — 1 site migrated (L4321)" }
phase_8 = { status = "completed", checkpointsha = "7ec512c", name = "Property setter / state sites (<=5 sites) — 2 sites migrated (L591, L897)" }
phase_9 = { status = "completed", checkpointsha = "<pending>", name = "Helper / utility sites (<=5 sites) — 0 sites in this track (L1398 is SILENT_SWALLOW, Phase 10)" }
phase_9 = { status = "completed", checkpointsha = "6b02f49", name = "Helper / utility sites (<=5 sites) — 0 sites in this track (L1398 is SILENT_SWALLOW, Phase 10)" }
phase_10 = { status = "pending", checkpointsha = "", name = "INTERNAL_SILENT_SWALLOW migrations (<=13 sites; logging NOT a drain)" }
phase_11 = { status = "pending", checkpointsha = "", name = "INTERNAL_RETHROW classification (<=2 sites; Pattern 1/2/3)" }
phase_12 = { status = "pending", checkpointsha = "", name = "UNCLEAR classification (<=2 sites)" }