conductor(plan): Mark Phase 4 and Track as complete
This commit is contained in:
@@ -18,7 +18,7 @@
|
||||
- [x] Task: Execute the migration script and verify the project root is clean. (61d513a)
|
||||
- [x] Task: Conductor - User Manual Verification 'Phase 3: Migration Script' (Protocol in workflow.md) (61d513a)
|
||||
|
||||
## Phase 4: Regression Testing & Final Verification
|
||||
- [ ] Task: Run a full session through the GUI and verify that all logs and temp files are created in the new sub-directories.
|
||||
- [ ] Task: Verify that `tests/artifacts/` is correctly ignored by git.
|
||||
- [ ] Task: Conductor - User Manual Verification 'Phase 4: Regression Testing & Final Verification' (Protocol in workflow.md)
|
||||
## Phase 4: Regression Testing & Final Verification [checkpoint: 6326546]
|
||||
- [x] Task: Run a full session through the GUI and verify that all logs and temp files are created in the new sub-directories. (6326546)
|
||||
- [x] Task: Verify that `tests/artifacts/` is correctly ignored by git. (6326546)
|
||||
- [x] Task: Conductor - User Manual Verification 'Phase 4: Regression Testing & Final Verification' (Protocol in workflow.md) (6326546)
|
||||
|
||||
Reference in New Issue
Block a user