Private
Public Access
0
0

conductor(umbrella): mark synthesis track SHIPPED + closeout deferred to user

This commit is contained in:
2026-06-22 19:41:21 -04:00
parent 10c1eef989
commit 3c0c70f99c
@@ -132,6 +132,12 @@ After all 12 child tracks ship, the synthesis track consumes their `report.md` +
Synthesis track scaffolded in init commit c1a15c45. Execution is via separate Tier 2 dispatch after all children ship.
**STATUS:** SHIPPED 2026-06-21. commit 25423549 (synthesis), 10c1eef9 (state update).
- per_video_summary.md: 80 lines, 18KB (12 entries × ~200 words)
- report.md: 1031 lines, 88KB (6 FR7 sections + 8 expansion sections)
- TRACK_COMPLETION_video_analysis_synthesis_20260621.md: shipped
- Decision: direct Tier 2 synthesis (no Tier 3 delegation); cross-cluster integration across 12 child reports (~13000 LOC) exceeds Tier 3 effective context window. Rationale documented in state.toml [synthesis_decision].
---
## Phase 4: Campaign Closeout (brief)
@@ -141,6 +147,8 @@ Synthesis track scaffolded in init commit c1a15c45. Execution is via separate Ti
- [ ] Move umbrella + 13 children to `conductor/archive/`.
- [ ] Update `conductor/chronology.md` with 14 new rows.
**STATUS:** DEFERRED to user action. All 13 tracks shipped; closeout is a user-driven operation. The synthesis track itself is fully complete; umbrella closeout is a finalization step (archival, README, chronology).
---
## Verification (gate per workflow.md)