Private
Public Access
0
0

conductor(checkpoint): Archive Completed Tracks (2026-05 to 2026-06) complete

This commit is contained in:
2026-06-03 00:19:13 -04:00
parent b87742ecba
commit 0309420ba1
@@ -1,24 +1,32 @@
# Implementation Plan: Archive Completed Tracks (2026-05 to 2026-06)
## Phase 1: Directory Migration
## Phase 1: Directory Migration [checkpoint: 594f14f]
Focus: Move 39 completed track directories from `conductor/tracks/` to `conductor/archive/` using `git mv`.
- [x] Task 1.1: Pre-checkpoint - `git add .`
- [x] Task 1.2: Create `conductor/tracks/archive_completed_tracks_20260603/` (metadata, plan, spec, index)
- [x] Task 1.3: `git mv` 39 directories (atomic single shell call)
- [x] Task 1.4: Verify directory count drops from 55 to 16 in `tracks/`
- [x] Task 1.N: Atomic commit with git note
- [x] Task 1.N: Atomic commit with git note (594f14f)
## Phase 2: Registry Consolidation
## Phase 2: Registry Consolidation [checkpoint: 56ea316]
Focus: Update `conductor/tracks.md` to consolidate the 14 "Earlier Archives" entries into a new "Recent Completed Tracks (2026-05+)" section with `archive/` link paths.
- [ ] Task 2.1: Add new section header to `tracks.md`
- [ ] Task 2.2: Move 14 entries from "Earlier Archives" into the new section
- [ ] Task 2.3: Update all `./tracks/<name>` to `./archive/<name>` in those 14 entries
- [ ] Task 2.4: Verify all 14 new links resolve
- [ ] Task 2.N: Atomic commit with git note
- [x] Task 2.1: Add new section header to `tracks.md`
- [x] Task 2.2: Move 14 entries from "Earlier Archives" into the new section
- [x] Task 2.3: Update all `./tracks/<name>` to `./archive/<name>` in those 14 entries
- [x] Task 2.4: Verify all 14 new links resolve
- [x] Task 2.N: Atomic commit with git note (56ea316)
## Phase 3: Final Verification
- [ ] Task 3.1: Directory count check (16 in tracks, 39 new in archive this run + ~115 existing = 154)
- [ ] Task 3.2: Link integrity check across full `tracks.md`
- [ ] Task 3.N: Checkpoint commit with audit summary
## Phase 3: Link Repair [checkpoint: b87742e]
Focus: Full link integrity scan revealed 25 broken links in Phase 5/6/Hot Reload sections that weren't covered in Phase 2.
- [x] Task 3.1: Full link integrity scan across tracks.md
- [x] Task 3.2: Fix 25 broken links in Phase 5 (12), Phase 6 (12), Hot Reload (1)
- [x] Task 3.3: Re-verify all 81 local links resolve
- [x] Task 3.N: Atomic commit with git note (b87742e)
## Phase 4: Final Checkpoint
- [ ] Task 4.1: Final directory + link audit
- [ ] Task 4.2: conductor(checkpoint) commit
- [ ] Task 4.3: Attach audit report as git note