Files
manual_slop/conductor/directives/contract_change_audit/meta.md
T

300 B

contract_change_audit

v1

Why this iteration: Lifted verbatim from conductor/edit_workflow.md:90-99 (Rule 8 contract-change check). Source: conductor/edit_workflow.md:90-99 (Rule 8 contract-change check) Lifted: 2026-07-02 (Phase A expansion harvest; user directive 2026-07-02)