994ded3598
The Phase 6+ section had two duplicate '### Active' headers, which made the chronology confusing. The user (paraphrased): preserve the chronology of project progress, don't need full detail, follow the previous restructure's lightweight pattern. Changes: - Add '### Recently Completed (2026-06-06 to 2026-06-10)' subsection containing the 3 closed tracks (startup_speedup, test_batching_refactor, test_infrastructure_hardening) with lightweight entries: per-phase commit SHAs only, 1-line summary, link to spec/plan/state folder. Trimmed the verbose per-sub-track commentary that was in the old startup_speedup entry (the per-sub-track bullets for warmup, status indicator, audit violations, post-shipping fixes are in the archive's spec/plan, not the tracks.md). - Remove the duplicate '### Active' header. - Update section intro to reflect '3 recently completed, 4 in plan' (was '2 already completed, 3 in plan'). - test_infrastructure_hardening entry now has phase commit SHAs (5df22fa8,67d0211e,006bb114,b8fcd9d6,33d5cac,7b87bbf5,84edb200,719fe9a) instead of just the closing-report link. Chronology is now visible at a glance; per-track full detail is in the linked archive/ folder.