Private
Public Access
0
0
Files
manual_slop/docs/reports
ed 9960a12b07 conductor(track): nagent_review_v3.1 marked completed + TRACK_COMPLETION
Finalize v3.1 track state per user decision 2026-06-20 (accept as v3.1 final; no v3.2). Mark [meta].status = completed, phase_15 checkpointsha = 8cd4a2fb. Write TRACK_COMPLETION_nagent_review_v3_1_20260620.md documenting what shipped, the 4 user directives applied, the 16 atomic commits, the 13 verification criteria status (10 met / 3 partial-met), and the 6 followup items.
2026-06-20 12:33:55 -04:00
..
2026-06-12 22:16:40 -04:00