In-depth handoff for Tier 1 review covering:
- Executive summary with TL;DR
- Goal & scope (planned vs delivered)
- Per-phase delivery summary
- Test coverage analysis (7 new + 2 adapted + 2 smoke)
- Deferred items documentation (3 cross-references)
- Pre-existing failures (14, verified not caused by this track)
- Plan deviations (6 items, with rationale)
- Post-ship risk register
- Commit inventory with diff stat
- 7 recommendations for the Tier 1 reviewer
- Handoff checklist
Working tree was clean before adding the report (no other changes to commit).