10-section campaign status report covering all 5 sub-tracks:
1. Campaign Overview (3/5 shipped; sub-track 4 init; sub-track 5 blocked)
2. Sub-Track 1: Review Pass (shipped 2026-06-17; 10 heuristics + 1 audit fix)
3. Sub-Track 2: Small Files (shipped 2026-06-18; Phase 10-13 sliming redo)
4. Sub-Track 3: App Controller (shipped 2026-06-19; Phase 6 + Phase 7; data plane)
5. Sub-Track 4: gui_2.py (initialized 2026-06-19; 13-phase anti-sliming structure)
6. Sub-Track 5: Baseline Cleanup (planned, blocked)
7. Anti-Sliming Patterns (5 campaign-wide lessons: logging NOT drain;
narrowing+logging is sliming; heuristic over-application is sliming;
test count integrity; per-phase audit gates)
8. Outstanding Items (4 pre-existing Gemini 503 skips; sub-track 4 NOT YET STARTED)
9. Recommendations (Tier 2 picks up Phase 0; consider new audit script for gui_2;
document anti-sliming template as styleguide)
10. References (12 doc refs)
Key insights:
- Net progress: 125 sites migrated (sub-tracks 2 + 3); 42 more in sub-track 4;
112 in sub-track 5. Total: ~279 sites when complete (was 268 originally;
grew as audit found more sites during migration).
- The data plane (8 controller state attributes) shipped in sub-track 3
Phase 6 is the source of truth for sub-track 4.
- Sub-track 4's 13-phase anti-sliming structure is the campaign's
mature template; sub-track 5 will follow it.
175 lines. Single source of truth for the campaign status.