ed d724295310 conductor(plan): mark track complete; campaign 100% closed (Phase 8 final)
Updates:
- conductor/tracks.md row 6d-6: active -> shipped; updated with end-of-track
  summary (9 wrappers obliterated across 4 files; 0 legacy wrappers remain;
  127/127 unit tests pass; 9/11 batched tiers PASS).
- conductor/tracks/result_migration_cruft_removal_20260620/state.toml:
  status active -> completed; current_phase -> 'complete'; phase_7 + phase_8
  -> completed; all verification flags updated.

CAMPAIGN 100% COMPLETE (6 of 6 tracks SHIPPED):
  1. result_migration_review_pass_20260617 (57 sites; audit heuristics)
  2. result_migration_small_files_20260617 (49 sites)
  3. result_migration_app_controller_20260618 (45 sites)
  4. result_migration_gui_2_20260619 (42 sites)
  5. result_migration_baseline_cleanup_20260620 (88 sites)
  6. result_migration_cruft_removal_20260620 (9 wrappers OBLITERATED)

  Total: 268 sites + 9 wrappers; 100% Result[T] convention coverage
  across all 65 src/ files. Zero migration-target violations, zero legacy
  wrappers, zero false-drain sites remain.