ed ce0d143877 feat(reports): META_TOOLING_DURATION_ANALYSIS_2026-07-05.md (10 sections, 379 lines)
Empirical duration analysis of the meta-tooling that built this
codebase from Feb 21 to Jul 5, 2026 (133 days, 248 tracks, 1003
sub-agent tasks, 1608 work-prefix commits, 312 sessions).

Era detection: 5 eras via multi-signal weighted-vote on
config.toml + conductor/workflow.md + conductor/tech-stack.md +
sub-agent log content (7-day cluster window).

Headline numbers:
- Era 0 (early, Feb 21 - Mar 20): 113 tracks
- Era 1 (mid, Mar 21 - May 3): 4 tracks (small era)
- Era 2 (mid, May 4 - Jun 1): 42 tracks
- Era 3 (late, Jun 2 - Jun 24): 69 tracks (peak productivity)
- Era 4 (current, Jun 25 - present): 20 tracks

Tier 3 worker median task duration: 272.5s (~4.5 min).
Tier 4 QA median task duration: 416s (~7 min).
Tier 1 median task duration: 0s (synthetic/orchestration only).

Use-case predictions (per files-touched bucket):
- 1-5 files (227 tracks): 0d median, 1.0 IQR
- 6-15 files (15 tracks): 1d median, 6.0 IQR
- 16-30 files (4 tracks): 2d median, 4.5 IQR
- 31+ files (2 tracks): 0d median (small sample)

Part of conductor/tracks/meta_tooling_duration_analysis_20260705/.