Private
Public Access
0
0
Files
manual_slop/conductor/tracks
ed b75ae57ef2 docs(spec): footnote 8 remaining UX adaptations (2-9) deferred to follow-up
After the end of Phase 5, only adaptation 1 of 9 from spec §6 was
applied (Screenshot button iff vision, render_files_and_media:3030).
The pattern is established; the remaining 8 are mechanical
applications of the same pattern at their respective render sites.
The follow-up track applies the wrapping at:
- tools toggle (tool_calling)
- cache panel (caching)
- stream progress (streaming)
- fetch models button (model_discovery)
- token budget max (context_window)
- cost panel (3 cost_tracking states: estimate / 'Free (local)' / '-')

The _get_active_capabilities() helper (t5.1) is already in place.
2026-06-11 09:13:55 -04:00
..
2026-06-06 00:42:40 -04:00