Private
Public Access
0
0
Files
manual_slop/conductor
ed bc3d17825e conductor(deob_lexicon): Add plan.md + metadata.json + state.toml + TIER2_STARTER.md
Scaffolds the Phase 1 (lexicon) child track with full Tier 2 dispatch support, matching the warmup's pattern.

- plan.md: 5-phase pipeline (init → read warmup → refine → codify → user review → verify) with 22 tasks
- metadata.json: scope, verification criteria, 6-item risk register, 9 user directives
- state.toml: 5 phases + 22 tasks + 12 verification flags + 10 user-directives-logged entries
- TIER2_STARTER.md: dispatch prompt with file-read order, 10 critical user directives, 6 key risks, hard constraints, sandbox conventions, 14 verification criteria, 5-phase execution plan, when-stuck guide, copy-paste-ready dispatch prompt

CRITICAL context for Tier 2: the warmup's 2026-06-23 surgical edits distinguished principled re-encodings (from the 5 rules) from user-specific re-encodings (Sectored Language, GA, classical Greek/Latin). Phase 1 FORMALIZES this distinction; it does NOT undo it.

- Tag each user-specific entry with [user-also-accepted]
- Move §3.5 (Sectored Language operator terms) to Appendix B
- DO NOT re-include esoteric content (Witness/Vessel/Aether) in the public lexicon
- DO NOT re-survey the samples; the cluster sub-reports are the evidence base
2026-06-23 15:43:35 -04:00
..
2026-06-11 23:28:39 -04:00