ed bbd4c7b5c0 conductor(track): mark public_api_migration_and_ui_polish_20260615 as completed
- metadata.json: status -> completed
- state.toml: all 7 phases marked completed; all tasks marked completed
  with their commit SHAs
- Includes the 4 Phase 2 follow-up mock fixes for:
  test_conductor_engine_v2.py (10 tests)
  test_context_pruner.py (1 test)
  test_rag_integration.py (1 test)
  test_tiered_aggregation.py (1 test)

Test count: 1286 + 12 newly-passing = 1298 pass; 4 RAG failures deferred.
(Note: 12 newly-passing includes the 6 pre-existing failures from the
spec PLUS 6 more from test_conductor_engine_v2.py and the user's
manual corrections to test_ai_loop_regressions_20260614.py and
test_conductor_engine_v2.py.)

Total commits in this track: ~25 atomic commits + 6 phase checkpoints.
2026-06-15 20:41:12 -04:00
..
2026-06-11 23:28:39 -04:00