Private
Public Access
0
0
Files
manual_slop/conductor
ed a88c748d77 conductor(tracks): un-mark startup_speedup as complete; sub-track 2 still pending
Phase 9 was shipped at 12cec6ae and the 9-phase core plan is done, but the [COMPLETE 2026-06-07] tag was applied prematurely. Sub-track 2 (audit violations) remains partial at ae3b433e with 61 violations remaining: pydantic in models.py (1), tree_sitter in file_cache.py (4), api_hooks.py (4), sloppy.py (5), app_controller.py (23), gui_2.py (24). Reopening the track to finish sub-track 2 in 6 per-file sub-tracks (2A-2F).
2026-06-07 09:36:08 -04:00
..