Private
Public Access
0
0
Files
manual_slop/scripts
ed 5370f8dcc6 conductor(track): mark result_migration_small_files_20260617 Phase 11 complete
Phase 11 (REJECT Phase 10's sliming). The full Result[T] migration for
the 21 slimed sites has been completed:

- 5 full Result migrations in warmup.py (on_complete, _record_success,
  _record_failure, _log_canary, _log_summary now return Result[T])
- 2 helper extracts: startup_profiler._log_phase_output and
  file_cache._get_mtime_safe (Result-returning helpers)
- 14 sites documented as already compliant (Result/BOUNDARY_CONVERSION/
  Heuristic #19 - not sliming, valid existing pattern)
- 1 known limitation: warmup._warmup_one L185 (indirect Result return
  via delegation; convention followed; audit has known limitation)

5 LAUNDERING HEURISTICS (#22-#26) REVERTED in commit 37872544.
Heuristic A (Result-returning recovery) ADDED in commit 3c839c91.

Test count corrected: Phase 10 wrongly claimed '10 tiers'; the 11th tier
is tier-1-unit-comms. Phase 11 ran ALL 11 tiers and 10 PASS; tier-3
fails on the pre-existing test_execution_sim_live flake (unrelated).

Updated:
- conductor/tracks/result_migration_small_files_20260617/state.toml
- conductor/tracks/result_migration_small_files_20260617/metadata.json
- conductor/tracks.md (sub-track 6d-2 row)
- conductor/tracks/result_migration_20260616/spec.md (umbrella)
- docs/reports/RESULT_MIGRATION_SMALL_FILES_20260617.md (Phase 11 addendum)
- docs/reports/TRACK_COMPLETION_result_migration_small_files_20260617.md
  (Phase 11 addendum with corrected test count)

Phase 11 is the actual completion. Phase 10 was rejected for sliming.
2026-06-18 00:39:59 -04:00
..
2026-06-06 12:47:41 -04:00
2026-06-07 11:51:36 -04:00
2026-06-07 11:51:36 -04:00
2026-06-15 20:10:18 -04:00