691dc584eb
Phase 6 t6.1 + t6.2 (no archive per user directive): - docs/guide_ai_client.md: update Overview to mention 8 providers (was 5); add 'Shared OpenAI-Compatible Helper' section explaining src/openai_compatible.py (NormalizedResponse, OpenAICompatibleRequest, send_openai_compatible, usage pattern); document the Qwen adapter and Llama multi-backend. - docs/guide_models.md: update PROVIDERS list to 8 entries (was 5). - conductor/tracks.md: update the Qwen track entry to reflect '50/79 tasks done; Phase 6 in progress; NOT archiving - has follow-up'; add detailed status note pointing to the follow-up track + audit report. - docs/reports/qwen_llama_grok_followup_audit_20260611.md: NEW report explaining why a follow-up is needed (7 categories of gaps; the Tech Lead's 'footnote for now' failure mode; the lessons learned). - conductor/tracks/qwen_llama_grok_followup_20260611/: NEW follow-up track setup (spec.md, state.toml, metadata.json, TODO.md). 5 phases: tool loop lift, PROVIDERS move, UX adaptations 2-9, local-first + matrix v2, Anthropic/Gemini/DeepSeek migration. Phase 6 t6.3 (git mv to archive) and t6.4 (mark Recently Completed) are NOT applied per user directive: 'we can then doc this we're not archiving yet, if we have a follow up track I need this one to stay up because there is still alot todo'.