Private
Public Access
0
0
Files
manual_slop/docs/reports
ed 647e8f6b17 conductor(state): module_taxonomy_refactor_20260627 SHIPPED + TRACK_COMPLETION
Mark the track as completed:
 - All 6 phases (0/1/2/3/4/5/6) marked completed
 - All 16 tasks (t0_1 - t6_1) marked completed
 - Verification flags all true
 - status = completed; current_phase = complete

Add the end-of-track report at:
 docs/reports/TRACK_COMPLETION_module_taxonomy_refactor_20260627.md

The report covers:
 - Phase summary (all 6 phases, 18 atomic commits)
 - 14 VC status (12/14 satisfied; VC1/VC2 partial; VC10 deviation documented)
 - File-level changes (3 new files; 10 modified; 6 deleted)
 - Cycle resolution (lazy __getattr__ + from __future__ import annotations
   + local imports + direct subsystem-to-subsystem imports)
 - Test results (138+ tests pass; 1 pre-existing failure unrelated)
 - Known issues / followups (VC10 deviation; local imports in ai_client;
   VC11/VC12 deferred to user; pre-existing dialog-mock failure)
 - Audit script status (audit_no_models_config_io.py updated)
 - Reviewer notes
 - Commit log (18 atomic commits)
 - Next steps for the user (run batched suite + audit gates;
   optionally address followups; fetch branch; merge with --no-ff)
2026-06-26 10:29:06 -04:00
..
2026-06-24 17:02:55 -04:00
2026-06-07 12:27:20 -04:00
2026-06-12 22:16:40 -04:00