Private
Public Access
0
0
Files
manual_slop/scripts
ed 5a58e1ceaf conductor(plan): Mark Task 6.2 complete - metadata.json to status=shipped
Track marked shipped 2026-06-17. All 6 verification criteria evaluated
with PASS/EXCEEDED/READY status and notes. 7 pre-existing test failures
documented with root cause and pre_existing_failures_remaining flag.

Risk register updated: scope_creep=none, behavior_change=none,
doc_drift=medium (error_handling.md deprecation section required
surgical rewrite to historical note).

No deferred_to_followup_tracks (this track completed cleanly).
2026-06-17 01:16:43 -04:00
..
2026-06-06 12:47:41 -04:00
2026-06-07 11:51:36 -04:00
2026-06-07 11:51:36 -04:00
2026-06-15 20:10:18 -04:00