manual_slop/conductor/tracks
ed 58c4370142 conductor(plan): resolve deferred work into proper task entries
The track had 3 categories of deferred work. Each is now
either a proper task entry in an upcoming phase or a
permanent deferral with rationale.

Resolution:

1. Phase 1 t1_7: 3 inline-loop vendors (anthropic, gemini,
   deepseek; gemini_cli was already migrated). Each vendor
   now has a proper Phase 5 task entry:
     t5_6: anthropic tool-loop conversion (3-5 days)
     t5_7: gemini tool-loop conversion (3-5 days)
     t5_8: deepseek tool-loop conversion (1-2 days)
   The previous single t1_7 line item is replaced by 3
   explicit tasks with scope estimates and blocked_by
   annotations.

2. Phase 4 t4_3: Meta Llama API. PERMANENT DEFERRED to
   Phase 6 t6_1. Meta does not publish a public API; full
   probe results in docs/reports/meta_llama_api_verification_20260611.md.

3. Phase 4 t4_7: UI adaptations for new v2 fields.
   CONSOLIDATED into Phase 5 t5_4 (which was originally
   'UI adaptations for new capabilities' — same scope).
   t5_4's description now enumerates the 11 specific UI
   adaptations (reasoning toggle, audio button, etc.).
   t4_7 is cancelled to avoid duplicate task entries.

Phase 5 expanded scope: 8 tasks total (was 5). The phase
is now a multi-week consolidation project (8-14 days) and
should be scoped as a fresh track, not a single follow-up
session.

Phase 6 placeholder added (not scheduled for execution):
  t6_1: Meta Llama API (deferred)
  t6_2: Track archive + final docs refresh

[deferred_work] section in state.toml rewritten (was stale:
mentioned gemini_cli as deferred but that vendor was
migrated in commit 4748d134 via send_func + on_pre_dispatch).

Verification flags added:
  all_8_vendors_on_tool_loop = false  (gates t5_6/7/8)
  v2_matrix_fully_populated = false   (gates t5_1/2/3)
  v2_ui_adaptations_shipped = false   (gates t5_4)
  phase_4_local_first_and_matrix_v2 = true  (Phase 4 done)

State file: 41 tasks, 6 phases, 12 verification fields,
parses cleanly.

Report: docs/reports/qwen_llama_grok_followup_deferred_work_20260611.md
(~95 lines; cross-references session-end + Meta verification
reports; documents the resolution decisions).