Private
Public Access
0
0
Files
manual_slop/tests
ed 19c534e54b TIER-2 READ conductor/code_styleguides/error_handling.md end-to-end before Phase 4: test(gui_2): add 2 Phase 4 invariant tests + relax Phase 3 invariant for decreasing count
The Phase 3 invariant test (test_phase_3_invariant_batch_a_count_dropped)
asserted exactly 17 INTERNAL_BROAD_CATCH sites, the post-Phase 3 baseline.
After Phase 4 migrates 3 more sites, the count drops to 14. The test now
asserts <= 17 (the upper bound; the Phase 3 boundary).

Adds test_phase_4_invariant_batch_b_count_dropped: locks in <= 14 sites
(post-Phase 4 baseline; down from 17).

Adds test_phase_4_invariant_all_3_migration_sites_have_tests: ensures each
of the 3 Batch B sites (L3398, L3718, L3740) has both _success and _failure tests.

All 30 tests pass.
2026-06-19 22:56:00 -04:00
..
2026-03-05 17:13:59 -05:00
2026-05-10 15:14:54 -04:00
2026-05-20 07:51:58 -04:00
2026-03-05 16:37:30 -05:00
2026-03-05 17:13:59 -05:00
2026-03-05 16:37:30 -05:00
2026-03-07 20:32:59 -05:00
2026-03-05 15:10:53 -05:00
2026-03-12 19:08:51 -04:00
2026-05-20 07:51:58 -04:00
2026-05-20 07:51:58 -04:00
ok
2026-03-07 21:40:40 -05:00