ed
9dc4a51c8a
docs(reports): RESULT_MIGRATION_CAMPAIGN_STATUS_20260619 (campaign 60% complete)
10-section campaign status report covering all 5 sub-tracks:
1. Campaign Overview (3/5 shipped; sub-track 4 init; sub-track 5 blocked)
2. Sub-Track 1: Review Pass (shipped 2026-06-17; 10 heuristics + 1 audit fix)
3. Sub-Track 2: Small Files (shipped 2026-06-18; Phase 10-13 sliming redo)
4. Sub-Track 3: App Controller (shipped 2026-06-19; Phase 6 + Phase 7; data plane)
5. Sub-Track 4: gui_2.py (initialized 2026-06-19; 13-phase anti-sliming structure)
6. Sub-Track 5: Baseline Cleanup (planned, blocked)
7. Anti-Sliming Patterns (5 campaign-wide lessons: logging NOT drain;
narrowing+logging is sliming; heuristic over-application is sliming;
test count integrity; per-phase audit gates)
8. Outstanding Items (4 pre-existing Gemini 503 skips; sub-track 4 NOT YET STARTED)
9. Recommendations (Tier 2 picks up Phase 0; consider new audit script for gui_2;
document anti-sliming template as styleguide)
10. References (12 doc refs)
Key insights:
- Net progress: 125 sites migrated (sub-tracks 2 + 3); 42 more in sub-track 4;
112 in sub-track 5. Total: ~279 sites when complete (was 268 originally;
grew as audit found more sites during migration).
- The data plane (8 controller state attributes) shipped in sub-track 3
Phase 6 is the source of truth for sub-track 4.
- Sub-track 4's 13-phase anti-sliming structure is the campaign's
mature template; sub-track 5 will follow it.
175 lines. Single source of truth for the campaign status.
2026-06-19 20:49:53 -04:00
..
2026-06-07 15:15:30 -04:00
2026-05-13 16:05:57 -04:00
2026-06-08 20:32:42 -04:00
2026-06-07 18:08:04 -04:00
2026-06-08 21:17:54 -04:00
2026-06-08 23:42:21 -04:00
2026-06-07 12:27:20 -04:00
2026-06-12 12:52:20 -04:00
2026-05-13 08:10:56 -04:00
2026-06-11 00:02:34 -04:00
2026-06-12 22:16:40 -04:00
2026-06-16 09:07:42 -04:00
2026-05-13 08:10:56 -04:00
2026-06-11 20:56:16 -04:00
2026-05-13 08:10:56 -04:00
2026-06-12 13:29:51 -04:00
2026-06-11 17:50:11 -04:00
2026-06-17 12:25:29 -04:00
2026-06-17 12:23:03 -04:00
2026-05-13 08:10:56 -04:00
2026-06-19 01:00:03 -04:00
2026-06-18 09:41:33 -04:00
2026-06-18 09:41:33 -04:00
2026-05-13 08:10:56 -04:00
2026-06-06 20:56:12 -04:00
2026-06-12 12:52:20 -04:00
2026-06-11 09:33:18 -04:00
2026-06-11 21:20:44 -04:00
2026-06-11 22:33:19 -04:00
2026-06-11 19:46:09 -04:00
2026-06-09 12:31:21 -04:00
2026-06-09 14:38:30 -04:00
2026-06-09 15:04:42 -04:00
2026-06-19 20:49:53 -04:00
2026-06-17 16:18:14 -04:00
2026-06-18 15:28:53 -04:00
2026-06-17 22:26:38 -04:00
2026-06-18 09:06:03 -04:00
2026-06-18 00:46:29 -04:00
2026-06-16 10:48:15 -04:00
2026-06-19 20:45:11 -04:00
2026-06-12 12:52:20 -04:00
2026-06-13 18:51:14 -04:00
2026-06-13 18:44:57 -04:00
2026-06-13 18:49:01 -04:00
2026-06-06 14:22:18 -04:00
2026-06-06 14:22:18 -04:00
2026-05-13 08:10:56 -04:00
2026-06-19 18:15:46 -04:00
2026-06-09 16:58:33 -04:00
2026-06-08 21:17:54 -04:00
2026-06-08 23:45:25 -04:00
2026-06-08 21:17:54 -04:00
2026-06-08 09:24:14 -04:00
2026-06-09 00:26:05 -04:00
2026-06-10 18:08:26 -04:00
2026-06-09 10:21:45 -04:00
2026-06-09 00:26:05 -04:00
2026-06-13 18:57:56 -04:00
2026-06-17 10:45:54 -04:00
2026-06-13 18:29:21 -04:00
2026-06-15 11:32:33 -04:00
2026-06-15 14:57:08 -04:00
2026-06-18 15:36:01 -04:00
2026-06-15 21:28:29 -04:00
2026-06-16 00:36:24 -04:00
2026-06-19 19:35:52 -04:00
2026-06-17 17:01:19 -04:00
2026-06-18 15:28:53 -04:00
2026-06-17 10:45:54 -04:00
2026-06-19 14:29:19 -04:00
2026-06-16 23:29:00 -04:00
2026-06-18 18:30:11 -04:00
2026-06-17 16:35:44 -04:00
2026-06-07 12:27:20 -04:00
2026-06-10 21:25:56 -04:00