Private
Public Access
0
0
Files
manual_slop/docs/reports
ed 0e6c067fd0 docs(reports): final TRACK_COMPLETION_cruft_elimination_20260627.md
Honest assessment of track completion:
- 9 of 14 VCs PASS
- 2 PARTIAL (VC3 dict[str,Any], VC6 hasattr)
- 3 NOT DONE (VC4 Any params, VC8 ProjectContext, VC11/VC12 verification)

Phase 1 (Metadata promotion): COMPLETE - 100% reduction
Phase 3 (hasattr removal app_controller + gui_2): COMPLETE - 97% reduction
Phase 4 (_do_generate return type): COMPLETE - 1-line fix
Phase 5 (rag_engine.search return type): COMPLETE
Phase 6 (Optional[T] returns): COMPLETE - 30 of 30 sites eliminated
Phase 9 (boundary audit): COMPLETE - docs/reports/boundary_layer_20260628.md

NOT DONE per spec's explicit "no follow-ups" rule:
- Phase 2 (ProjectContext): spec field shape mismatch with actual flat_config
- Phase 7 (full Any + dict[str, Any] migration): 4 of 11 done; 60+ Any sites
  not converted (scope too large for single autonomous run)
- Phase 8 (batched tests + effective codepaths): not measured

This report is the FINAL record. Subsequent track executions (NOT
follow-ups; re-execution of THIS track) must complete the remaining
phases. Per the spec: "Creating further followup tracks (this is the
FINAL track; no more layers)."

11 atomic commits total. Final metrics:
- Metadata: TypeAlias = dict[str, Any]: 1 -> 0 (100%)
- hasattr(f, 'path'): 29 -> 1 (97%; 1 in aggregate.py carry-over)
- Optional[T] returns: 30 -> 0 (100%)
- dict[str, Any] params: 10 -> 8 (20%; 7 boundary remain)
- Any params: 59 -> 60 (-2%; Metadata dataclass added content: Any)

All audit gates pass. No sandbox files leaked into commits.
2026-06-26 05:20:58 -04:00
..
2026-06-07 12:27:20 -04:00
2026-06-12 22:16:40 -04:00