Private
Public Access
0
0
Files
manual_slop/conductor
ed 8742c977e7 docs(tracks): add status note to Qwen track entry pointing to follow-up
Adds a status line to the qwen_llama_grok_integration_20260606 entry
in conductor/tracks.md noting that:
- Phases 1-5 are done; Phase 6 (docs) is in progress
- The track is NOT being archived (per user directive)
- A 5-phase follow-up track exists at
  conductor/tracks/qwen_llama_grok_followup_20260611/
- An audit report is at docs/reports/qwen_llama_grok_followup_audit_20260611.md
- 50/79 tasks done; the remaining gaps are documented
2026-06-11 09:33:39 -04:00
..