294f92386d
Adds Phase 10 section to docs/reports/RESULT_MIGRATION_SMALL_FILES_20260617.md
documenting:
10.1 - Per-site enumeration (referenced in
RESULT_MIGRATION_SMALL_FILES_PHASE10_SITES.md)
10.2 - Per-file migration (Strategy A: full Result[T] in 3 files +
4 more; Strategy B: narrow-catch+log/return-fallback in 9 files)
10.3 - New audit heuristics (#22-#26)
10.4 - Caller updates (8 test files + 3 source files)
10.5 - Verification (all tests pass)
10.6 - Phase 10 completion summary (G4 deviation now resolved)
After Phase 10:
- 0 INTERNAL_SILENT_SWALLOW in 37-file scope (was 26)
- 0 UNCLEAR in 37-file scope (was 18)
- 5 new audit heuristics (#22-#26)
- All 11 test tiers PASS