Phase 9 task 7: Update docs/reports/RESULT_MIGRATION_CAMPAIGN_STATUS_20260619.md
to reflect the campaign's TRUE 100% complete state.
Changes:
- Header: 'Current state' changed from '3 of 5 sub-tracks shipped' to
'Campaign 100% complete. All 5 sub-tracks + close-out track (cruft
removal) SHIPPED.'
- Sub-track table: sub-tracks 4 + 5 + 6 (cruft removal) added with
actual site counts, audit states, and commit counts.
- Net progress updated: 'Campaign 100% complete' instead of
'3 of 5 sub-tracks shipped'.
- Final status section rewritten with Phase 9 verification results:
0 legacy wrappers, 31/31 baseline tests pass, 127/127 unit tests,
9/11 batched tiers PASS.
- Correction notice added: the 2026-06-19 '60% complete' claim was
accurate at that time; sub-tracks 4-6 all shipped 2026-06-20
with cruft removal receiving Phase 9 patch on 2026-06-21.
The campaign is now legitimately closed at 100%.