Commit Graph
2 Commits
Author SHA1 Message Date
ed 2939bea9db docs(reports): Phase 9 - update campaign status to true 100% complete (Tier 1 §12.3 FR9-4)
Phase 9 task 7: Update docs/reports/RESULT_MIGRATION_CAMPAIGN_STATUS_20260619.md
to reflect the campaign's TRUE 100% complete state.

Changes:
- Header: 'Current state' changed from '3 of 5 sub-tracks shipped' to
  'Campaign 100% complete. All 5 sub-tracks + close-out track (cruft
  removal) SHIPPED.'
- Sub-track table: sub-tracks 4 + 5 + 6 (cruft removal) added with
  actual site counts, audit states, and commit counts.
- Net progress updated: 'Campaign 100% complete' instead of
  '3 of 5 sub-tracks shipped'.
- Final status section rewritten with Phase 9 verification results:
  0 legacy wrappers, 31/31 baseline tests pass, 127/127 unit tests,
  9/11 batched tiers PASS.
- Correction notice added: the 2026-06-19 '60% complete' claim was
  accurate at that time; sub-tracks 4-6 all shipped 2026-06-20
  with cruft removal receiving Phase 9 patch on 2026-06-21.

The campaign is now legitimately closed at 100%.
2026-06-21 08:43:38 -04:00
ed 9dc4a51c8a docs(reports): RESULT_MIGRATION_CAMPAIGN_STATUS_20260619 (campaign 60% complete)
10-section campaign status report covering all 5 sub-tracks:
  1. Campaign Overview (3/5 shipped; sub-track 4 init; sub-track 5 blocked)
  2. Sub-Track 1: Review Pass (shipped 2026-06-17; 10 heuristics + 1 audit fix)
  3. Sub-Track 2: Small Files (shipped 2026-06-18; Phase 10-13 sliming redo)
  4. Sub-Track 3: App Controller (shipped 2026-06-19; Phase 6 + Phase 7; data plane)
  5. Sub-Track 4: gui_2.py (initialized 2026-06-19; 13-phase anti-sliming structure)
  6. Sub-Track 5: Baseline Cleanup (planned, blocked)
  7. Anti-Sliming Patterns (5 campaign-wide lessons: logging NOT drain;
     narrowing+logging is sliming; heuristic over-application is sliming;
     test count integrity; per-phase audit gates)
  8. Outstanding Items (4 pre-existing Gemini 503 skips; sub-track 4 NOT YET STARTED)
  9. Recommendations (Tier 2 picks up Phase 0; consider new audit script for gui_2;
     document anti-sliming template as styleguide)
  10. References (12 doc refs)

Key insights:
  - Net progress: 125 sites migrated (sub-tracks 2 + 3); 42 more in sub-track 4;
    112 in sub-track 5. Total: ~279 sites when complete (was 268 originally;
    grew as audit found more sites during migration).
  - The data plane (8 controller state attributes) shipped in sub-track 3
    Phase 6 is the source of truth for sub-track 4.
  - Sub-track 4's 13-phase anti-sliming structure is the campaign's
    mature template; sub-track 5 will follow it.

175 lines. Single source of truth for the campaign status.
2026-06-19 20:49:53 -04:00