The 3-pass video analysis research campaign is CLOSED. All 25 tracks are archived at conductor/archive/analysis/.
22 video_analysis tracks moved:
- 1 Pass 1 umbrella (video_analysis_campaign_20260621)
- 12 Pass 1 video reports (cs229, probability_logic, entropy_epiplexity, score_dynamics, platonic, free_lunches, generic_systems, brain, neural_dynamics, multiscale, cs336, creikey)
- 1 Pass 1 synthesis (video_analysis_synthesis_20260621)
- 1 Pass 2 umbrella (video_analysis_deob_20260621)
- 4 Pass 2 sub-tracks (warmup, lexicon, pilot, apply)
- 3 sub-tracks (lexicon_v2, c11_reference, pass3)
The 3 sub-tracks of video_analysis_deob_*_20260623 are the v2 corrective patch, the C11 reference, and Pass 3.
All post-move paths:
- conductor/archive/analysis/video_analysis_campaign_20260621/
- conductor/archive/analysis/video_analysis_<slug>_20260621/ (x12)
- conductor/archive/analysis/video_analysis_synthesis_20260621/
- conductor/archive/analysis/video_analysis_deob_20260621/
- conductor/archive/analysis/video_analysis_deob_<warmup|lexicon|pilot|apply>_20260621/
- conductor/archive/analysis/video_analysis_deob_<lexicon_v2|c11_reference|pass3>_20260623/
2728 files renamed (mostly artifacts/frames/*.jpg from the Pass 1 video acquisitions).
Per user 2026-06-23: 'ok write a report to cohesively wrap up this campaign. Lets move all the video analaysis into archive/analysis.' The campaign is officially CLOSED.
Both qwen_llama_grok tracks (parent + follow-up) archived
to conductor/archive/ per the parent track's Phase 6 plan.
conductor/tracks/qwen_llama_grok_integration_20260606/
-> conductor/archive/qwen_llama_grok_integration_20260606/
conductor/tracks/qwen_llama_grok_followup_20260611/
-> conductor/archive/qwen_llama_grok_followup_20260611/
Follow-up state.toml updates:
- status: active -> archived
- current_phase: 5 -> 6
- phase_6 status: pending -> completed
- t4_3 (Meta Llama) reclassified from 'deferred' to
'cancelled' (the 'deferral' was the agent's invention;
the real situation is permanent, awaiting Meta)
- t6_1 (Meta Llama API): proper task entry; cancelled
per the actual situation (no public surface)
- t6_2 (Track archive): proper task entry; completed
- Cleaned up the '3-5 days' / '1-2 weeks' comment in
deferred_work that the user called out as made up
- Removed duplicate [verification] section markers
and duplicate keys that crept in from prior edits
tracks.md updated with 2 new entries under
'Phase 9: Chore Tracks' (Completed) listing both
archived tracks with their reports.
Net result: the qwen_llama_grok track family is fully
archived. The only remaining permanent deferral is
Meta Llama API (t6_1), blocked on Meta's product
decision. All other work is in src/ or scripts/
and is reachable from there.
- Moved codebase_migration_20260302 to archive
- Moved gui_decoupling_controller_20260302 to archive
- Moved test_architecture_integrity_audit_20260304 to archive
- Removed deprecated test_suite_performance_and_flakiness_20260302