Commit Graph

748 Commits

Author SHA1 Message Date
ed 9b7d16b0be conductor(plan): Mark Phase 1 as complete 2026-05-02 18:31:52 -04:00
ed ef8f71b9d8 conductor(plan): Mark track as complete 2026-05-02 14:04:39 -04:00
ed 6bffdd4939 conductor(plan): Mark Phase 2 as complete 2026-05-02 13:49:02 -04:00
ed db85d60de7 conductor(plan): Mark Phase 1 as complete 2026-05-02 13:26:47 -04:00
ed d2c0d02d19 conductor(plan): Mark tasks 2 and 3 as complete in Phase 1 2026-05-02 13:23:28 -04:00
ed 2666a3390d feat(ai): Harden tool access exclusion across all providers 2026-05-02 13:23:00 -04:00
ed 92492f30c5 conductor(plan): Mark Phase 3 as complete 2026-05-02 13:11:17 -04:00
ed 8364070ac4 docs(audit): Generate codebase audit report 2026-05-02 13:10:47 -04:00
ed 72e15ce9df conductor(plan): Mark Phase 2 as complete 2026-05-02 13:10:28 -04:00
ed a7b64049ae conductor(plan): Mark task 'Audit api_hook_client.py' as complete 2026-05-02 13:08:53 -04:00
ed 351f5e09eb conductor(plan): Mark Phase 1 as complete 2026-05-02 12:59:27 -04:00
ed c1daef97a5 conductor(plan): Mark task 'Audit native_orchestrator.py' as complete 2026-05-02 12:58:06 -04:00
ed 955df17f2e conductor(plan): Mark task 'Audit dag_engine.py' as complete 2026-05-02 12:55:21 -04:00
ed 46baaeae89 conductor(plan): Mark task 'Audit multi_agent_conductor.py' as complete 2026-05-02 12:53:07 -04:00
ed 7ae0d13278 conductor(checkpoint): Checkpoint end of Phase 3 2026-05-02 12:18:27 -04:00
ed 228d4001fc conductor(plan): Checkpoint Phase 2 2026-05-02 12:08:29 -04:00
ed bf148ff6a2 conductor(checkpoint): Checkpoint end of Phase 2 2026-05-02 12:07:38 -04:00
ed 43b9a11f67 conductor(plan): Mark phase 'Phase 1: Audit and Identification' as complete 2026-05-02 12:05:22 -04:00
ed 30107fd877 conductor(checkpoint): Checkpoint end of Phase 1 2026-05-02 12:04:50 -04:00
ed 91789a2265 chore(conductor): Add new track 'Review investigation of codebase and expose/cull any hidden invisible prompting either from the system or directly that the user cannot handle for any discussion/session.' 2026-05-02 12:00:18 -04:00
ed 1f0bd94f10 WIP: Catching up on state of this codebase.. 2026-05-02 11:59:22 -04:00
ed 7d9d8a70e8 conductor(plan): Phase 4 checkpoint complete
Takes panel implemented:
- List of takes with entry count
- Switch/delete actions per take
- Synthesis UI with take selection
- Uses existing synthesis_formatter
2026-03-22 13:28:01 -04:00
ed e567223031 conductor(plan): Phase 3 checkpoint complete
Context Composition panel implemented:
- Shows files with Auto-Aggregate/Force Full flags
- Shows screenshots
- Preset save/load/delete functionality
2026-03-22 13:17:39 -04:00
ed 266a67dcd9 conductor(plan): Phase 2 checkpoint complete
Discussion Hub now has tab bar structure:
- Discussion (history + message/response)
- Context Composition (placeholder)
- Snapshot (Aggregate MD + System Prompt)
- Takes (placeholder)
2026-03-22 13:06:34 -04:00
ed 51d05c15e0 conductor(plan): Phase 1 checkpoint complete
Phase 1 complete:
- Removed ui_summary_only global toggle
- Renamed Context Hub to Project Settings
- Removed Context Presets tab
- All tests passing
2026-03-22 12:59:41 -04:00
ed c205c6d97c conductor(plan): Mark tasks complete in discussion_hub_panel_reorg 2026-03-22 12:58:05 -04:00
ed 2ed9867e39 feat(gui): Rename Context Hub to Project Settings
- gui_2.py: Window title changed to 'Project Settings'
- app_controller.py: show_windows key updated
- Updated tests to reference new name
2026-03-22 12:57:49 -04:00
ed f5d4913da2 feat(gui): Remove ui_summary_only global toggle
The ui_summary_only global aggregation toggle was redundant with per-file flags
(auto_aggregate, force_full). Removed:
- Checkbox from Projects panel (gui_2.py)
- State variable and project load/save (app_controller.py)

Per-file flags remain the intended mechanism for controlling aggregation.

Tests added to verify removal and per-file flag functionality.
2026-03-22 12:54:32 -04:00
ed abe1c660ea conductor(tracks): Add two deferred future tracks
- aggregation_smarter_summaries: Sub-agent summarization, hash-based caching
- system_context_exposure: Expose hidden _SYSTEM_PROMPT for user customization
2026-03-22 12:43:47 -04:00
ed dd520dd4db conductor(tracks): Add discussion_hub_panel_reorganization track
This track addresses the fragmented implementation of Session Context Snapshots
and Discussion Takes & Timeline Branching tracks (2026-03-11) which were
marked complete but the UI panel layout was not properly reorganized.

New track structure:
- Phase 1: Remove ui_summary_only, rename Context Hub to Project Settings
- Phase 2: Merge Session Hub into Discussion Hub (4 tabs)
- Phase 3: Context Composition tab (per-discussion file filter)
- Phase 4: DAW-style Takes timeline integration
- Phase 5: Final integration and cleanup

Also archives the two botched tracks and updates tracks.md.
2026-03-22 12:35:32 -04:00
ed dcf10a55b3 conductor(plan): Mark task 'Apply review suggestions' as complete 2026-03-21 10:40:18 -04:00
ed ab30c15422 conductor(plan): Checkpoint end of Phase 4 2026-03-19 20:09:33 -04:00
ed 0738f62d98 conductor(plan): Mark Phase 4 backend tasks as complete 2026-03-19 20:06:47 -04:00
ed 7d100fb340 conductor(plan): Checkpoint end of Phase 3 2026-03-19 20:01:59 -04:00
ed 343fb48959 conductor(plan): Mark Phase 3 backend tasks as complete 2026-03-19 19:53:42 -04:00
ed 45bffb7387 conductor(plan): Checkpoint end of Phase 2 2026-03-19 19:49:51 -04:00
ed b077aa8165 conductor(plan): Mark Phase 2 as complete 2026-03-19 19:46:09 -04:00
ed 54cc85b4f3 conductor(plan): Checkpoint end of Phase 1 2026-03-19 19:14:06 -04:00
ed 9f4fe8e313 conductor(plan): Mark Phase 1 backend tasks as complete 2026-03-19 19:01:33 -04:00
ed ca7d1b074f conductor(plan): Mark phase 'Phase 4: Agent-Focused Session Filtering' as complete 2026-03-18 15:42:41 -04:00
ed 038c909ce3 conductor(plan): Mark phase 'Phase 3: Transparent Context Visibility' as complete 2026-03-18 13:04:39 -04:00
ed c5df29b760 conductor(plan): Mark phase 'Phase 2: GUI Integration & Persona Assignment' as complete 2026-03-18 00:51:22 -04:00
ed 1e223b46b0 conductor(plan): Mark phase 'Phase 1: Backend Support for Context Presets' as complete 2026-03-17 23:45:18 -04:00
ed b4396697dd finished a track 2026-03-17 23:26:01 -04:00
ed 74c9d4b992 conductor(plan): Mark phase 'Phase 1: State & Interface Update' as complete 2026-03-17 22:51:49 -04:00
ed d18eabdf4d fix(gui): Add push_id to _render_selectable_label; finalize track 2026-03-13 22:35:47 -04:00
ed 1164aefffa feat(thinking): Complete track - all phases done 2026-03-13 22:07:56 -04:00
ed 1ad146b38e feat(gui): Add _render_thinking_trace helper and integrate into Discussion Hub 2026-03-13 22:07:13 -04:00
ed 95e6413017 feat(thinking): Phases 1-2 complete - parser, model, tests 2026-03-13 22:02:34 -04:00
ed fc7b491f78 test: Add thinking persistence tests; Phase 2 complete 2026-03-13 21:56:35 -04:00