Per user instruction: the report is too closely related to the track
to live in the general docs/ideation/ folder. It's the track's main
deliverable, not a general ideation doc. The existing convention for
track reports is the track folder (e.g., nagent_review_20260608/report.md).
This commit is the phase 2+3 work:
- Adds the integrated report (417 lines, 8 ## headings, 40 ###)
to conductor/tracks/intent_dsl_survey_20260612/report.md
- Adds 5 Tier 2 sub-reports (1319 lines combined) to
conductor/tracks/intent_dsl_survey_20260612/research/
- Removes the old docs/ideation/ location (moved, not duplicated)
- Updates spec.md, plan.md, metadata.json, tracks.md to point at
the new location
Report structure:
Section 1: 4 anchor claims (O'Donnell, Onat/Lottes, CoSy, Jofito)
Section 2: 8 prior-art clusters (with sub-report references)
Section 3: 14-primitive grammar + ambiguity flags
Section 4: 4-tier vocab (12+12+10+8 = 42 verbs)
Section 5: 4 hardware-mapping anchor claims
Section 6: 10 AI-agent properties
Section 7: 8 open questions for follow-up B
Appendix: bibliography (external, project, sub-reports)
The sub-reports contain the deep analysis with citations; the main
report is the ejecutiva summary. Tier 2 sub-agents handled the heavy
research (5 cluster sub-reports in research/); Tier 1 focused on
integration and writing the simpler sections inline.
Time-sensitive: report must complete before nagent v2.2.
Executable plan for the report. 28 tasks across 4 phases:
- Phase 1 (Tasks 1-3): source gathering + state/metadata + outline stub
- Phase 2 (Tasks 4-14): write sections 1, 2 (8 clusters), 3
- Phase 3 (Tasks 15-23): write sections 4 (4 tiers), 5, 6, 7 + Appendix
- Phase 4 (Tasks 24-28): self-review + user review + final commit + tracks.md
Each task has file:line references, exact commands, and expected
output. Self-review confirms all 21 spec requirements are covered;
no placeholders; type-consistent.
The track is research-only, so the plan recommends inline execution
by a single Tier 2 Tech Lead. Subagent-driven per task is also an
option if context isolation is preferred.
Time-sensitive: report must complete before nagent v2.2.