Private
Public Access
0
0
Commit Graph

3 Commits

Author SHA1 Message Date
ed c4085319ff docs(ssdl): rename SSDL shape symbols to concise form (o->, o=>)
Final vocabulary:
- ===>        -> ->        (codepath)
- ===>W===>  -> =>        (wide codepath)
- o==>       -> o->       (codecycle)
- oo==>oo    -> o=>       (wide codecycle)
- ===>B===>  -> ->B->     (codepath with branch)
- ===>M===>  -> ->M->     (codepath with merge)

Composites ===>B===> and ===>M===> preserved as ->B->/->M-> so the
branch/merge markers stay visible (vs. dropping them entirely).

Scope: 3 reports files (computational_shapes_ssdl_digest,
proposed_new_tracks, session_synthesis), 4 intent_dsl_survey files
(plan, report, report_v1.1, report_v1.2), 3 nagent_review files
(state.toml description, v2_2, v2_3). All old symbols verified gone
via grep; all new symbols verified present at expected locations.
2026-06-12 12:52:20 -04:00
ed 72e9a63c86 docs(ideation→track): Move report into intent_dsl_survey_20260612 folder
Per user instruction: the report is too closely related to the track
to live in the general docs/ideation/ folder. It's the track's main
deliverable, not a general ideation doc. The existing convention for
track reports is the track folder (e.g., nagent_review_20260608/report.md).

This commit is the phase 2+3 work:
  - Adds the integrated report (417 lines, 8 ## headings, 40 ###)
    to conductor/tracks/intent_dsl_survey_20260612/report.md
  - Adds 5 Tier 2 sub-reports (1319 lines combined) to
    conductor/tracks/intent_dsl_survey_20260612/research/
  - Removes the old docs/ideation/ location (moved, not duplicated)
  - Updates spec.md, plan.md, metadata.json, tracks.md to point at
    the new location

Report structure:
  Section 1: 4 anchor claims (O'Donnell, Onat/Lottes, CoSy, Jofito)
  Section 2: 8 prior-art clusters (with sub-report references)
  Section 3: 14-primitive grammar + ambiguity flags
  Section 4: 4-tier vocab (12+12+10+8 = 42 verbs)
  Section 5: 4 hardware-mapping anchor claims
  Section 6: 10 AI-agent properties
  Section 7: 8 open questions for follow-up B
  Appendix: bibliography (external, project, sub-reports)

The sub-reports contain the deep analysis with citations; the main
report is the ejecutiva summary. Tier 2 sub-agents handled the heavy
research (5 cluster sub-reports in research/); Tier 1 focused on
integration and writing the simpler sections inline.

Time-sensitive: report must complete before nagent v2.2.
2026-06-12 09:28:06 -04:00
ed 5ef68a0046 conductor(track): Add intent_dsl_survey_20260612 plan
Executable plan for the report. 28 tasks across 4 phases:

- Phase 1 (Tasks 1-3): source gathering + state/metadata + outline stub
- Phase 2 (Tasks 4-14): write sections 1, 2 (8 clusters), 3
- Phase 3 (Tasks 15-23): write sections 4 (4 tiers), 5, 6, 7 + Appendix
- Phase 4 (Tasks 24-28): self-review + user review + final commit + tracks.md

Each task has file:line references, exact commands, and expected
output. Self-review confirms all 21 spec requirements are covered;
no placeholders; type-consistent.

The track is research-only, so the plan recommends inline execution
by a single Tier 2 Tech Lead. Subagent-driven per task is also an
option if context isolation is preferred.

Time-sensitive: report must complete before nagent v2.2.
2026-06-12 08:30:38 -04:00