Commit Graph

553 Commits

Author SHA1 Message Date
Ed_
3322b630c2 conductor(plan): Mark task 'Task 1.1' as complete 2026-03-02 16:38:51 -05:00
Ed_
687545932a refactor(mma_exec): remove UNFETTERED_MODULES — all deps use generate_skeleton() 2026-03-02 16:38:28 -05:00
Ed_
22b08ef91e conductor(plan): Mark Phase 3 complete [checkpoint: b30e563] 2026-03-02 16:30:35 -05:00
Ed_
4f77d8fdd9 conductor(plan): Mark Phase 2 complete [checkpoint: 865d8dd] 2026-03-02 16:23:21 -05:00
Ed_
fb0d6be2e6 conductor(plan): Record Phase 1 checkpoint bc1a570; mark Task 2.1 in progress 2026-03-02 16:20:52 -05:00
Ed_
bc1a5707a0 conductor(checkpoint): Checkpoint end of Phase 1 — mma_agent_focus_ux 2026-03-02 16:20:25 -05:00
Ed_
00a196cf13 conductor(plan): Mark Phase 1 tasks 1.1-1.6 complete (8d9f25d) 2026-03-02 16:19:01 -05:00
Ed_
8ea636147e conductor(plan): Mark phase 'Phase 3 - Token Budget Layout Fix' as complete [0d081a2] 2026-03-02 15:55:53 -05:00
Ed_
35abc265e9 conductor(plan): Mark task 3.4 complete — Token Budget collapsing header verified 2026-03-02 15:55:28 -05:00
Ed_
5180038090 conductor(plan): Mark task 3.3 complete — 32 passed 2026-03-02 15:51:10 -05:00
Ed_
bd3d0e77db conductor(plan): Mark tasks 3.1-3.2 complete, begin 3.3 — 6097368 2026-03-02 15:50:27 -05:00
Ed_
97792e7fff conductor(plan): Mark phase 'Phase 2 - Menu Bar Consolidation' as complete [15fd786] 2026-03-02 15:44:11 -05:00
Ed_
b96405aaa3 conductor(plan): Mark task 2.4 complete — Quit menu verified by user 2026-03-02 15:43:47 -05:00
Ed_
e6e8298025 conductor(plan): Mark task 2.3 complete — 32 passed 2026-03-02 15:42:13 -05:00
Ed_
acd7c05977 conductor(plan): Mark task 2.2 complete, begin 2.3 — 340f44e 2026-03-02 15:41:34 -05:00
Ed_
cb5f328da3 conductor(plan): Mark task 2.1 complete, begin 2.2 — b0f5a5c 2026-03-02 15:39:41 -05:00
Ed_
129cc33d01 conductor(plan): Mark phase 'Phase 1 - Dead Code Removal' as complete [be7174c] 2026-03-02 15:35:26 -05:00
Ed_
763bc2e734 conductor(plan): Mark task 1.4 complete — Comms History panel verified visually 2026-03-02 14:32:25 -05:00
Ed_
10724f86a5 conductor(plan): Mark task 1.3 complete — 32 passed, import ok, 2 pre-existing failures unrelated 2026-03-02 14:29:57 -05:00
Ed_
535667b51f conductor(plan): Mark task 1.2 complete — e28f89f 2026-03-02 14:25:15 -05:00
Ed_
21c74772f6 conductor(plan): Mark task 1.1 complete — 2e9c995 2026-03-02 14:23:47 -05:00
Ed_
b9686392d7 chore: apply ruff auto-fixes and remove dead AST scripts 2026-03-02 13:26:20 -05:00
Ed_
13926bce2f docs: Add DOD/Immediate Mode heuristics and backlog future tracks 2026-03-02 13:02:59 -05:00
Ed_
b4de62f2e7 docs: Enforce strict atomic per-task commits for Tier 2 agents 2026-03-02 12:52:04 -05:00
Ed_
ff7f18b2ef conductor(track): Add task to remove hardcoded machine paths from mma_exec scripts 2026-03-02 12:47:35 -05:00
Ed_
5b3c0d2296 docs: Add Meta-Boundary guide to clarify Application vs Tooling domains 2026-03-02 12:44:34 -05:00
Ed_
9eabebf9f4 conductor(track): Expand scope of architecture track to fully integrate MCP tools 2026-03-02 12:39:41 -05:00
Ed_
bf10231ad5 conductor(track): Initialize testing consolidation track and add execution order 2026-03-02 12:29:41 -05:00
Ed_
1eeed31040 conductor(track): Initialize 'architecture_boundary_hardening' track 2026-03-02 12:26:07 -05:00
Ed_
95bf42aa37 conductor(track): Initialize 'tech_debt_and_test_cleanup' and 'conductor_workflow_improvements' tracks 2026-03-02 12:14:57 -05:00
Ed_
c1a86e2f36 conductor(track): Initialize track 'mma_agent_focus_ux_20260302' 2026-03-02 11:57:39 -05:00
Ed_
4f11d1e01d conductor(track): Initialize track 'feature_bleed_cleanup_20260302' 2026-03-02 11:50:46 -05:00
Ed_
d577457330 conductor(plan): Close track context_token_viz_20260301 — all phases verified 2026-03-02 11:39:10 -05:00
Ed_
2929a64b34 conductor(plan): Mark Phase 3 tasks 3.1-3.2 complete [context_token_viz_20260301] 6f18102 2026-03-02 11:27:16 -05:00
Ed_
6f18102863 feat(token-viz): Phase 3 — auto-refresh triggers and /api/gui/token_stats endpoint 2026-03-02 11:27:00 -05:00
Ed_
7b5d9b1212 feat(token-viz): Phase 2 — trim warning, Gemini/Anthropic cache status display 2026-03-02 11:23:57 -05:00
Ed_
9ae6f9da05 conductor(plan): Mark Phase 1 tasks complete [context_token_viz_20260301] 5bfb20f 2026-03-02 11:16:54 -05:00
Ed_
5bfb20f06f feat(token-viz): Phase 1 — token budget panel with color bar and breakdown table 2026-03-02 11:16:32 -05:00
Ed_
970b4466d4 conductor(tracks): remove deleted ux_sim_test artifact from tracks.md 2026-03-02 10:47:24 -05:00
Ed_
776d709246 chore: delete ux_sim_test_20260301 — test artifact from New Track form exercise 2026-03-02 10:47:14 -05:00
Ed_
c35f372f52 conductor(tracks): archive 3 completed tracks, update tracks.md with active/archived sections 2026-03-02 10:46:08 -05:00
Ed_
9fb01ce5d1 feat(mma): complete Phase 6 and finalize Comprehensive GUI UX track
- Implement Live Worker Streaming: wire ai_client.comms_log_callback to Tier 3 streams
- Add Parallel DAG Execution using asyncio.gather for non-dependent tickets
- Implement Automatic Retry with Model Escalation (Flash-Lite -> Flash -> Pro)
- Add Tier Model Configuration UI to MMA Dashboard with project TOML persistence
- Fix FPS reporting in PerformanceMonitor to prevent transient 0.0 values
- Update Ticket model with retry_count and dictionary-like access
- Stabilize Gemini CLI integration tests and handle script approval events in simulations
- Finalize and verify all 6 phases of the implementation plan
2026-03-01 22:38:43 -05:00
Ed_
d1ce0eaaeb feat(gui): implement Phases 2-5 of Comprehensive GUI UX track
- Add cost tracking with new cost_tracker.py module
- Enhance Track Proposal modal with editable titles and goals
- Add Conductor Setup summary and New Track creation form to MMA Dashboard
- Implement Task DAG editing (add/delete tickets) and track-scoped discussion
- Add visual polish: color-coded statuses, tinted progress bars, and node indicators
- Support live worker streaming from AI providers to GUI panels
- Fix numerous integration test regressions and stabilize headless service
2026-03-01 20:17:31 -05:00
Ed_
a7903d3a4b conductor(plan): Mark tasks 1.2 and 1.3 complete — 8e57ae1 2026-03-01 15:49:32 -05:00
Ed_
05cd321aa9 conductor(plan): Mark task 'Task 1.1' as complete 3a68243 2026-03-01 15:28:51 -05:00
Ed_
a7c8183364 conductor(plan): Mark simulation_hardening_20260301 all tasks complete
All 9 tasks done across 3 phases. Key fixes beyond spec:
- btn_approve_script wired (was implemented but not registered)
- pending_script_approval exposed in hook API
- mma_tier_usage exposed in hook API
- pytest-timeout installed
- Tier 3 subscription auth fixed (ANTHROPIC_API_KEY stripping)
- --dangerously-skip-permissions for headless workers

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-01 14:32:25 -05:00
Ed_
5cacbb1151 conductor(plan): Mark task 3.2 complete — sim test PASSED
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-01 14:04:57 -05:00
Ed_
c023ae14dc conductor(plan): Update task 3.1 complete, 3.2 awaiting verification 2026-03-01 13:42:52 -05:00
Ed_
24ed309ac1 conductor(plan): Mark task 3.1 complete — Stage 8 assertions already correct 2026-03-01 13:26:15 -05:00
Ed_
0fe74660e1 conductor(plan): Mark Phase 2 complete, begin Phase 3 2026-03-01 13:25:24 -05:00