Commit Graph
8 Commits
Author SHA1 Message Date
ed 8297c021b4 conductor(state): mark Phase 1 (lexicon) completed with user approval
All 5 phases marked completed; 12 verification flags all true; shipped_commit b7988c49
User approved 2026-06-23.

Phase 2 (pilot) and Phase 3 (apply) are now unblocked (consume lexicon.md + terms_catalog.md + dedup_map.md)
2026-06-23 16:04:23 -04:00
ed b7988c49d4 conductor(deob_lexicon): Phase 4+5 - end-of-track report - lexicon SHIPPED (1,304 LOC across 3 atomic commits, 14/31 unresolved items defined, 5 architectural questions answered) 2026-06-23 15:54:08 -04:00
ed af657b1c61 conductor(deob_lexicon): Phase 3 - dedup_map.md (224 LOC) - 6 noise-dedup maps refined: 3 principled (Curry-Howard, Sets=Kinds, Functions=Procedures) + 3 user-preferred (GA collapse, invent->construct, number=expression) 2026-06-23 15:52:44 -04:00
ed 5e90c158e9 conductor(deob_lexicon): Phase 3 - terms_catalog.md (156 LOC) - machine-readable lexicon with 72 terms in 4 tiers, principled/user-also-accepted tags, etymology + form anchor + source cluster per term 2026-06-23 15:52:30 -04:00
ed 18001f34e0 conductor(deob_lexicon): Phase 2+3 - lexicon.md (924 LOC) - codified operational spec with 5 rules, 72 terms, 7 test cases, 31 unresolved items addressed, 5 architectural questions answered 2026-06-23 15:52:16 -04:00
ed 1e11237a06 conductor(deob_lexicon): Phase 1 complete - read warmup outputs (report.md 714L, prompt_template.md 332L, spot-checked cluster_3+cluster_9) 2026-06-23 15:47:22 -04:00
ed bc3d17825e conductor(deob_lexicon): Add plan.md + metadata.json + state.toml + TIER2_STARTER.md
Scaffolds the Phase 1 (lexicon) child track with full Tier 2 dispatch support, matching the warmup's pattern.

- plan.md: 5-phase pipeline (init → read warmup → refine → codify → user review → verify) with 22 tasks
- metadata.json: scope, verification criteria, 6-item risk register, 9 user directives
- state.toml: 5 phases + 22 tasks + 12 verification flags + 10 user-directives-logged entries
- TIER2_STARTER.md: dispatch prompt with file-read order, 10 critical user directives, 6 key risks, hard constraints, sandbox conventions, 14 verification criteria, 5-phase execution plan, when-stuck guide, copy-paste-ready dispatch prompt

CRITICAL context for Tier 2: the warmup's 2026-06-23 surgical edits distinguished principled re-encodings (from the 5 rules) from user-specific re-encodings (Sectored Language, GA, classical Greek/Latin). Phase 1 FORMALIZES this distinction; it does NOT undo it.

- Tag each user-specific entry with [user-also-accepted]
- Move §3.5 (Sectored Language operator terms) to Appendix B
- DO NOT re-include esoteric content (Witness/Vessel/Aether) in the public lexicon
- DO NOT re-survey the samples; the cluster sub-reports are the evidence base
2026-06-23 15:43:35 -04:00
ed 256af96bf3 conductor(deob_phases): Initialize 3 phase child spec scaffolds
Each child spec is lightweight (~120 lines): references the umbrella, gives the deliverable structure, specifies the inputs/outputs, and the 5-phase pipeline.

Phase 1 (lexicon): refines the warmup's draft into a codified operational spec (lexicon.md + terms_catalog.md + dedup_map.md)
Phase 2 (pilot): applies the lexicon to 2 Pass 1 reports (cs229_building_llms + entropy_epiplexity), captures refinements in pilot_report.md
Phase 3 (apply): applies the refined lexicon to 10 remaining Pass 1 reports + 1 cross-cutting synthesis, final apply_report.md

3-layer deliverable per video: translation (side-by-side) + replacement (re-encoded) + decoder (per-term etymology + form anchor + definition history)
4 verification criteria: lossless, bounded, constructively typed, etymology-cited
2026-06-23 00:08:23 -04:00