ed
|
2b5185a78f
|
perf(entropy): Fix nested imports in hot paths
Hoisted imports from inside frequently-called functions to module level:
app_controller.py:
- Added traceback and inspect at module level
- Removed 3 nested traceback imports from exception handlers
gui_2.py:
- Added traceback at module level
- Removed nested traceback import from _gui_func exception handler
- Kept uvicorn lazy-loaded (only for --headless mode)
multi_agent_conductor.py:
- Removed unused 'import sys' from run()
- Removed redundant nested imports (already at module level)
Also adds audit scripts and entropy findings documentation.
|
2026-05-06 20:18:30 -04:00 |
|
ed
|
54afbb9365
|
chore(entropy): Phase 5 start - fix duplicate line bug and document findings
- Fix duplicate line bug in rag_emb_provider.setter (app_controller.py)
- Add entropy_findings.md documenting audit results
- Update plan.md with Phase 5 tasks and findings
- Note: Property getter/setter 'duplicates' are false positives - proper Python patterns
|
2026-05-06 19:59:06 -04:00 |
|
ed
|
8ac81c087c
|
chore(conductor): Mark track 'Optimization pass for Data-Oriented Python heuristics' as complete
|
2026-05-06 15:51:35 -04:00 |
|
ed
|
fcd7252087
|
docs(conductor): Synchronize docs for track 'Optimization pass for Data-Oriented Python heuristics'
|
2026-05-06 15:50:38 -04:00 |
|
ed
|
5c9948da97
|
conductor(plan): Track complete
|
2026-05-06 15:44:27 -04:00 |
|
ed
|
299d9e59a6
|
docs(perf): Final summary report and C extension evaluation
|
2026-05-06 15:38:02 -04:00 |
|
ed
|
90807d3065
|
conductor(plan): Phase 3 complete
|
2026-05-06 15:28:43 -04:00 |
|
ed
|
f628e0b29a
|
perf(core): Optimize DAG engine, orchestrator loop, and simulations
|
2026-05-06 15:27:27 -04:00 |
|
ed
|
2e68f1e997
|
conductor(plan): Phase 2 complete
|
2026-05-06 14:45:59 -04:00 |
|
ed
|
7a7298730d
|
docs(perf): Document identified bottlenecks
|
2026-05-06 14:44:54 -04:00 |
|
ed
|
1294619cc5
|
conductor(plan): Mark task 'Audit simulation/' as complete
|
2026-05-06 14:44:29 -04:00 |
|
ed
|
05db5bd54a
|
conductor(plan): Mark task 'Audit src/' as complete
|
2026-05-06 14:43:10 -04:00 |
|
ed
|
7dc91ddb85
|
conductor(plan): Mark task 'Run profiling scenarios' as complete
|
2026-05-06 14:40:30 -04:00 |
|
ed
|
6ac784b8bf
|
conductor(plan): Phase 1 complete
|
2026-05-06 14:33:03 -04:00 |
|
ed
|
56e9627f68
|
conductor(plan): Mark task 'Expand profiling instrumentation' as complete
|
2026-05-06 14:31:10 -04:00 |
|
ed
|
022c39888c
|
conductor(plan): Mark task 'Review existing profiling instrumentation' as complete
|
2026-05-06 14:10:28 -04:00 |
|
ed
|
ae2b79a3ad
|
conductor(plan): Mark task 'Update product-guidelines.md' as complete
|
2026-05-06 14:08:30 -04:00 |
|
ed
|
fbaef6c1bb
|
docs(guidelines): Add Data-Oriented Python heuristics
|
2026-05-06 14:08:12 -04:00 |
|
ed
|
b500fc5901
|
docs(conductor): Synchronize docs for track 'Beads Mode Integration'
|
2026-05-06 13:50:10 -04:00 |
|
ed
|
2b66f3569b
|
feat(beads): integrate Beads Mode backend, MCP tools, and GUI support
|
2026-05-06 13:48:47 -04:00 |
|
ed
|
52855e80d3
|
chore(conductor): Mark track 'Advanced Workspace Docking & Layout Profiles' as complete
|
2026-05-05 21:58:37 -04:00 |
|
ed
|
a402103e6f
|
conductor(plan): Mark phase 'Contextual Auto-Switch' as complete
|
2026-05-05 21:58:16 -04:00 |
|
ed
|
ecc5a66027
|
feat(workspace): implement contextual auto-switch layout based on MMA active tier
|
2026-05-05 21:57:08 -04:00 |
|
ed
|
fe06acbffc
|
conductor(plan): Mark phase 'GUI Menu Integration' as complete
|
2026-05-05 21:26:53 -04:00 |
|
ed
|
f22265b0c7
|
conductor(checkpoint): Checkpoint end of Phase 3 - GUI Menu Integration
|
2026-05-05 21:26:04 -04:00 |
|
ed
|
1251b4e722
|
chore(conductor): Update track status to complete
|
2026-05-05 20:11:55 -04:00 |
|
ed
|
45d0c6ce68
|
conductor(plan): Mark Phase 6 and Track as complete
|
2026-05-05 20:11:10 -04:00 |
|
ed
|
992e206769
|
feat(mcp): Finalize C/C++ AST tools with robust testing and bug fixes
|
2026-05-05 20:08:51 -04:00 |
|
ed
|
584e8e526e
|
conductor(plan): Mark phase 'Phase 5: Parity with Python Tools' as complete
|
2026-05-05 19:49:38 -04:00 |
|
ed
|
b2fb69ca07
|
conductor(plan): Mark Phase 5 as complete
|
2026-05-05 19:49:09 -04:00 |
|
ed
|
fe3d573a9a
|
conductor(plan): Mark Task 5.3 as complete
|
2026-05-05 19:45:16 -04:00 |
|
ed
|
98551a14d9
|
conductor(plan): Mark Task 5.1 and 5.2 as complete
|
2026-05-05 19:42:50 -04:00 |
|
ed
|
b8460107b9
|
chore(conductor): Expand Tree-Sitter C/C++ track with new phases for tool parity and robust testing
|
2026-05-05 19:31:25 -04:00 |
|
ed
|
b0ed7026dc
|
docs(conductor): Synchronize docs for track 'Tree-Sitter C/C++ MCP Tools'
|
2026-05-05 19:15:51 -04:00 |
|
ed
|
80e4b062a7
|
conductor(plan): Mark phase 'Phase 4: Tests' as complete
|
2026-05-05 19:09:24 -04:00 |
|
ed
|
e8c2d88adb
|
conductor(plan): Mark Phase 4 tasks as complete
|
2026-05-05 19:08:18 -04:00 |
|
ed
|
6490be7616
|
conductor(plan): Mark Phase 3 tasks as complete
|
2026-05-05 18:58:41 -04:00 |
|
ed
|
ac60dee5ae
|
conductor(plan): Mark phase 'Phase 2: ASTParser Extensions' as complete
|
2026-05-05 18:54:25 -04:00 |
|
ed
|
41082a09ad
|
conductor(plan): Mark Phase 2 core tasks as complete
|
2026-05-05 18:53:09 -04:00 |
|
ed
|
0b819b29c1
|
conductor(plan): Mark Task 2.1 as complete
|
2026-05-05 18:43:45 -04:00 |
|
ed
|
ab9446dc05
|
conductor(plan): Mark phase 'Phase 1: Dependencies' as complete
|
2026-05-05 18:38:00 -04:00 |
|
ed
|
1f86c6202f
|
conductor(checkpoint): Checkpoint end of Phase 1 - Dependencies
|
2026-05-05 18:37:34 -04:00 |
|
ed
|
e3b542e9d3
|
conductor(plan): Mark Task 1.1 as complete
|
2026-05-05 18:35:58 -04:00 |
|
ed
|
568c549d99
|
feat(deps): Add tree-sitter C and C++ grammars
|
2026-05-05 18:35:23 -04:00 |
|
ed
|
550e7011ff
|
docs(conductor): Synchronize docs for track 'Undo/Redo History Support'
|
2026-05-05 18:29:19 -04:00 |
|
ed
|
63614cfd44
|
chore(conductor): Mark track 'Undo/Redo History Support' as complete
|
2026-05-05 17:53:58 -04:00 |
|
ed
|
feeb724760
|
conductor(plan): Mark phase 'UI Features & History List' as complete
|
2026-05-05 17:52:03 -04:00 |
|
ed
|
b3c28a0697
|
conductor(plan): Mark tasks in Phase 4 as complete
|
2026-05-05 17:39:23 -04:00 |
|
ed
|
2612763e73
|
conductor(plan): Mark phase 'Discussion & Context Structure Mutation' as complete
|
2026-05-05 15:19:36 -04:00 |
|
ed
|
0a5b90e772
|
conductor(checkpoint): Checkpoint end of Phase 3 - Discussion & Context Structure Mutation
|
2026-05-05 12:17:53 -04:00 |
|