Private
Public Access
0
0
Commit Graph

5 Commits

Author SHA1 Message Date
ed 1ea38ad16b conductor(track): close 4 test-hell lineage tracks (state + metadata)
- test_infrastructure_hardening_20260609: status active->completed,
  last_updated 2026-06-09->2026-06-10, t7_*/t8_* tasks marked complete
  with commit SHAs (84edb200, 719fe9a, cb525519)
- mma_tier_usage_reset_fix_20260610: status spec->shipped
- rag_phase4_sync_fix_20260610: status spec->shipped
- workspace_path_finalize_20260609: status active->completed,
  current_phase 1->complete, all tasks marked complete
  (c725270b, 93ec2809), verification flags flipped to true
2026-06-10 20:09:01 -04:00
ed 2c924fe6df test(infra): poll-for-event race fixes + watchdog timeout bump + spec update 2026-06-10 15:14:35 -04:00
ed 80697e221a conductor(checkpoint): RAG phase 4 sync fix + test assertion fix - track complete 2026-06-10 13:55:06 -04:00
ed 2ad0d6a3f0 conductor(plan): Update RAG sync fix track state - sync works, retrieval assertion is separate 2026-06-10 13:29:18 -04:00
ed 989b2e6835 conductor(plan): New track for RAG phase 4 sync fix 2026-06-10 12:45:56 -04:00