Private
Public Access
conductor(plan): Mark Phase 4 tasks 4.1 + 4.4 complete (17/17 tests PASSED, phase checkpoints appended)
This commit is contained in:
@@ -18,7 +18,7 @@ last_updated = "2026-06-29"
|
||||
phase_1 = { status = "completed", checkpoint_sha = "7577d7d", name = "Move default layout to layouts/ + create src/layouts.py stack (mirror themes/)" }
|
||||
phase_2 = { status = "completed", checkpoint_sha = "3d87f8e7", name = "Install-on-empty-INI in App._post_init" }
|
||||
phase_3 = { status = "completed", checkpoint_sha = "3b966288", name = "Remove hardcoded test-fixture path from production code" }
|
||||
phase_4 = { status = "pending", checkpoint_sha = "", name = "Verification + checkpoint" }
|
||||
phase_4 = { status = "completed", checkpoint_sha = "pending", name = "Verification + checkpoint" }
|
||||
|
||||
[tasks]
|
||||
# Phase 1 (10 tasks)
|
||||
|
||||
Reference in New Issue
Block a user