conductor(plan): Mark phase 'Phase 1: Audit and Structural Design' as complete

This commit is contained in:
2026-02-23 18:40:00 -05:00
parent 6a35da1eb2
commit b1687f4a6b

View File

@@ -1,12 +1,12 @@
# Implementation Plan: GUI Layout Audit and UX Refinement # Implementation Plan: GUI Layout Audit and UX Refinement
## Phase 1: Audit and Structural Design ## Phase 1: Audit and Structural Design [checkpoint: 6a35da1]
Perform a thorough review of the current GUI and define the target layout. Perform a thorough review of the current GUI and define the target layout.
- [x] Task: Audit current GUI panels (AI Settings, Context, Diagnostics, History) and document placement issues. d177c0b - [x] Task: Audit current GUI panels (AI Settings, Context, Diagnostics, History) and document placement issues. d177c0b
- [x] Task: Propose a reorganized layout structure that prioritizes dockable/floatable window flexibility. 8448c71 - [x] Task: Propose a reorganized layout structure that prioritizes dockable/floatable window flexibility. 8448c71
- [x] Task: Review proposal with user and finalize the structural plan. 8448c71 - [x] Task: Review proposal with user and finalize the structural plan. 8448c71
- [~] Task: Conductor - User Manual Verification 'Phase 1: Audit and Structural Design' (Protocol in workflow.md) - [x] Task: Conductor - User Manual Verification 'Phase 1: Audit and Structural Design' (Protocol in workflow.md) 6a35da1
## Phase 2: Layout Reorganization ## Phase 2: Layout Reorganization
Implement the structural changes to panel placements and window behaviors. Implement the structural changes to panel placements and window behaviors.