conductor(plan): Mark Phase 2 as complete

This commit is contained in:
2026-03-19 19:46:09 -04:00
parent 1f7880a8c6
commit b077aa8165

View File

@@ -7,10 +7,10 @@
- [x] Task: Conductor - User Manual Verification 'Phase 1: Backend Support for Timeline Branching' (Protocol in workflow.md) - [x] Task: Conductor - User Manual Verification 'Phase 1: Backend Support for Timeline Branching' (Protocol in workflow.md)
## Phase 2: GUI Implementation for Tabbed Takes ## Phase 2: GUI Implementation for Tabbed Takes
- [ ] Task: Write GUI tests verifying the rendering and navigation of multiple tabs for a single session. - [x] Task: Write GUI tests verifying the rendering and navigation of multiple tabs for a single session. [3225125]
- [ ] Task: Implement a tabbed interface within the Discussion window to switch between different takes of the active session. - [x] Task: Implement a tabbed interface within the Discussion window to switch between different takes of the active session. [3225125]
- [ ] Task: Add a "Split/Branch from here" action to individual message entries in the discussion history. - [x] Task: Add a "Split/Branch from here" action to individual message entries in the discussion history. [e48835f]
- [ ] Task: Add a UI button/action to promote the currently active take to a new separate session. - [x] Task: Add a UI button/action to promote the currently active take to a new separate session. [1f7880a]
- [ ] Task: Conductor - User Manual Verification 'Phase 2: GUI Implementation for Tabbed Takes' (Protocol in workflow.md) - [ ] Task: Conductor - User Manual Verification 'Phase 2: GUI Implementation for Tabbed Takes' (Protocol in workflow.md)
## Phase 3: Synthesis Workflow Formatting ## Phase 3: Synthesis Workflow Formatting