chore(conductor): Add new track 'Review GUI design and UX refinement'
This commit is contained in:
38
conductor/tracks/gui_layout_refinement_20260223/plan.md
Normal file
38
conductor/tracks/gui_layout_refinement_20260223/plan.md
Normal file
@@ -0,0 +1,38 @@
|
||||
# Implementation Plan: GUI Layout Audit and UX Refinement
|
||||
|
||||
## Phase 1: Audit and Structural Design
|
||||
Perform a thorough review of the current GUI and define the target layout.
|
||||
|
||||
- [ ] Task: Audit current GUI panels (AI Settings, Context, Diagnostics, History) and document placement issues.
|
||||
- [ ] Task: Propose a reorganized layout structure that prioritizes dockable/floatable window flexibility.
|
||||
- [ ] Task: Review proposal with user and finalize the structural plan.
|
||||
- [ ] Task: Conductor - User Manual Verification 'Phase 1: Audit and Structural Design' (Protocol in workflow.md)
|
||||
|
||||
## Phase 2: Layout Reorganization
|
||||
Implement the structural changes to panel placements and window behaviors.
|
||||
|
||||
- [ ] Task: Refactor `gui.py` panel definitions to align with the new structural plan.
|
||||
- [ ] Write Tests (Verify panel existence and dockable flags)
|
||||
- [ ] Implement layout changes
|
||||
- [ ] Task: Optimize Dear PyGui window configuration for better multi-viewport handling.
|
||||
- [ ] Write Tests (Verify window persistence/flags)
|
||||
- [ ] Implement changes
|
||||
- [ ] Task: Conductor - User Manual Verification 'Phase 2: Layout Reorganization' (Protocol in workflow.md)
|
||||
|
||||
## Phase 3: Visual and Tactile Enhancements
|
||||
Implement Arcade FX and increase information density.
|
||||
|
||||
- [ ] Task: Enhance Arcade FX (blinking, animations) for AI state changes and tool execution.
|
||||
- [ ] Write Tests (Simulate state changes)
|
||||
- [ ] Implement FX logic in `gui.py`
|
||||
- [ ] Task: Increase tactile density in diagnostic and context tables.
|
||||
- [ ] Write Tests (Check widget count/spacing in specific panels)
|
||||
- [ ] Implement density improvements
|
||||
- [ ] Task: Conductor - User Manual Verification 'Phase 3: Visual and Tactile Enhancements' (Protocol in workflow.md)
|
||||
|
||||
## Phase 4: Iterative Refinement and Final Audit
|
||||
Fine-tune the UI based on live usage and verify against product guidelines.
|
||||
|
||||
- [ ] Task: Perform a "live" walkthrough to identify friction points in the new layout.
|
||||
- [ ] Task: Final polish of widget spacing, colors, and tactile feedback.
|
||||
- [ ] Task: Conductor - User Manual Verification 'Phase 4: Iterative Refinement and Final Audit' (Protocol in workflow.md)
|
||||
Reference in New Issue
Block a user