conductor(plan): Phase 3 complete

This commit is contained in:
2026-05-06 15:28:43 -04:00
parent f628e0b29a
commit 90807d3065
@@ -18,7 +18,7 @@
- [x] Task: Refactor the first identified bottleneck to align with data-oriented guidelines (Green Phase). (2e68f1e) - [x] Task: Refactor the first identified bottleneck to align with data-oriented guidelines (Green Phase). (2e68f1e)
- [x] Task: Write/update tests for remaining identified bottlenecks. (56e9627) - [x] Task: Write/update tests for remaining identified bottlenecks. (56e9627)
- [x] Task: Refactor remaining identified bottlenecks. (d0aff71) - [x] Task: Refactor remaining identified bottlenecks. (d0aff71)
- [ ] Task: Conductor - User Manual Verification 'Phase 3: Targeted Optimization and Refactoring' (Protocol in workflow.md) - [x] Task: Conductor - User Manual Verification 'Phase 3: Targeted Optimization and Refactoring' (Protocol in workflow.md) (f628e0b)
## Phase 4: Final Evaluation and Documentation ## Phase 4: Final Evaluation and Documentation
- [ ] Task: Re-run all profiling scenarios to compare against the baseline metrics. - [ ] Task: Re-run all profiling scenarios to compare against the baseline metrics.