docs: TRACK_COMPLETION + chronology row + state.toml superseded

Track closed per user direction with PARTIAL completion (17 of 31
tasks done; 13 deferred to followup tracks).

TRACK_COMPLETION_test_suite_cleanup_gemini_cli_removal_20260705.md
records the 12-VC status (7 PASS, 5 NOT DONE / NOT VERIFIED), the
phase-by-phase breakdown, branch state, risks, and hand-off notes.

conductor/chronology.md: Active row updated to 'Partially Completed'
with the commit range + summary of completed/deferred work.

state.toml: status = 'superseded'; current_phase kept at 1 (mid-Phase 1)
to reflect actual stopping point; new [followup_tracks] section
records the two upcoming tracks:
- vendor_ai_client_track (Front C metadata work)
- test_de_crufting_track (Front B cruft work)
This commit is contained in:
ed
2026-07-05 21:29:05 -04:00
parent fa5c1e936a
commit 8a1e2ecc9e
3 changed files with 148 additions and 5 deletions
@@ -1,19 +1,30 @@
# Track state for test_suite_cleanup_gemini_cli_removal_20260705
# Initialized by Tier 1 Orchestrator on 2026-07-05.
# 3 fronts: Gemini CLI removal + test suite cleanup + metadata-type reduction.
# Closed 2026-07-05 per user direction: partial completion; remaining
# work folded into two upcoming follow-up tracks (vendor_ai_client_track
# for the metadata-type reduction; test_de_crufting_track for the test
# suite cruft). See docs/reports/TRACK_COMPLETION_test_suite_cleanup_gemini_cli_removal_20260705.md.
[meta]
track_id = "test_suite_cleanup_gemini_cli_removal_20260705"
name = "Test Suite Cleanup + Gemini CLI Adapter Removal + Metadata-Type Reduction"
status = "active"
status = "superseded"
current_phase = 1
last_updated = "2026-07-05 (mid-execution)"
last_updated = "2026-07-05 (closed - partial; deferred to followup tracks)"
[blocked_by]
# None. The Gemini CLI removal is independent; the test cleanup is independent; the metadata reduction is independent.
[blocks]
# None. The track advances the ARCHIVE_REVIEW_20260705.md follow-up items (#1, #2, #6) but doesn't block them.
# None directly. ARCHIVE_REVIEW_20260705.md follow-up items #1, #2, #6 are
# captured by the upcoming vendor_ai_client_track (t3.1, t3.2, t3.3, t3.4, t3.6)
# and test_de_crufting_track (t2.4, t2.6, t2.7, t2.8).
[followup_tracks]
# Work remaining after this track's partial completion. Author will create
# the metadata.json + plan.md for each when ready.
vendor_ai_client_track = { source = "this track t3.1+t3.2+t3.3+t3.4+t3.6", owner = "user-upcoming" }
test_de_crufting_track = { source = "this track t2.4+t2.6+t2.7+t2.8", owner = "user-upcoming" }
[phases]
phase_1 = { status = "in_progress_partial_6_of_11", checkpointsha = "7e06d812", name = "Front A — Gemini CLI Adapter Removal (src + tests + docs + mock provider)" }