Private
Public Access
0
0

docs(phase-6): update ai_client+models guides; report + follow-up track setup

Phase 6 t6.1 + t6.2 (no archive per user directive):
- docs/guide_ai_client.md: update Overview to mention 8 providers (was 5);
  add 'Shared OpenAI-Compatible Helper' section explaining
  src/openai_compatible.py (NormalizedResponse, OpenAICompatibleRequest,
  send_openai_compatible, usage pattern); document the Qwen adapter
  and Llama multi-backend.
- docs/guide_models.md: update PROVIDERS list to 8 entries (was 5).
- conductor/tracks.md: update the Qwen track entry to reflect
  '50/79 tasks done; Phase 6 in progress; NOT archiving - has follow-up';
  add detailed status note pointing to the follow-up track + audit
  report.
- docs/reports/qwen_llama_grok_followup_audit_20260611.md: NEW report
  explaining why a follow-up is needed (7 categories of gaps; the
  Tech Lead's 'footnote for now' failure mode; the lessons learned).
- conductor/tracks/qwen_llama_grok_followup_20260611/: NEW follow-up
  track setup (spec.md, state.toml, metadata.json, TODO.md).
  5 phases: tool loop lift, PROVIDERS move, UX adaptations 2-9,
  local-first + matrix v2, Anthropic/Gemini/DeepSeek migration.

Phase 6 t6.3 (git mv to archive) and t6.4 (mark Recently Completed)
are NOT applied per user directive: 'we can then doc this we're not
archiving yet, if we have a follow up track I need this one to stay
up because there is still alot todo'.
This commit is contained in:
2026-06-11 09:33:18 -04:00
parent 457255bcd4
commit 691dc584eb
8 changed files with 745 additions and 3 deletions
+1 -1
View File
@@ -16,7 +16,7 @@ Tracks that are unblocked and ready to start. Ordered by **dependency** (blocked
| # | Priority | Track | Status | Blocked By |
|---|---|---|---|---|
| 2 | A | [Qwen, Llama & Grok Vendor Integration + Capability Matrix](#track-qwen-llama-grok-vendor-integration--capability-matrix) | spec ✓, plan pending | **test_infrastructure_hardening_20260609 (merged)** |
| 2 | A | [Qwen, Llama & Grok Vendor Integration + Capability Matrix](#track-qwen-llama-grok-vendor-integration--capability-matrix) | spec ✓, plan ✓, 50/79 tasks done; **Phase 6 in progress (docs); NOT archiving — has follow-up track** | **test_infrastructure_hardening_20260609 (merged)** |
| 3 | A | [Data-Oriented Error Handling (Fleury Pattern)](#track-data-oriented-error-handling-fleury-pattern) | spec ✓, plan ✓, ready to start | startup_speedup, test_batching_refactor, **test_infrastructure_hardening_20260609 (merged)**, qwen_llama_grok |
| 4 | A | [Data Structure Strengthening (Type Aliases + NamedTuples)](#track-data-structure-strengthening-type-aliases--namedtuples) | spec ✓, plan pending | **test_infrastructure_hardening_20260609 (merged)** |
| 5 | A | [MCP Architecture Refactor (Sub-MCP Extraction)](#track-mcp-architecture-refactor-sub-mcp-extraction) | spec ✓, plan pending | test_infrastructure_hardening_20260609 (merged), data_oriented_error_handling, data_structure_strengthening |