conductor(plan): Track complete

This commit is contained in:
2026-05-06 15:44:27 -04:00
parent 299d9e59a6
commit 5c9948da97
@@ -24,4 +24,4 @@
- [x] Task: Re-run all profiling scenarios to compare against the baseline metrics. (90807d3) - [x] Task: Re-run all profiling scenarios to compare against the baseline metrics. (90807d3)
- [x] Task: Analyze remaining bottlenecks that did not reach performance thresholds and document them as candidates for C/C++ bindings (Last Resort). (7a72987) - [x] Task: Analyze remaining bottlenecks that did not reach performance thresholds and document them as candidates for C/C++ bindings (Last Resort). (7a72987)
- [x] Task: Generate a final summary report of the optimizations applied and the C extension evaluation. (7a72987) - [x] Task: Generate a final summary report of the optimizations applied and the C extension evaluation. (7a72987)
- [~] Task: Conductor - User Manual Verification 'Phase 4: Final Evaluation and Documentation' (Protocol in workflow.md) - [x] Task: Conductor - User Manual Verification 'Phase 4: Final Evaluation and Documentation' (Protocol in workflow.md) (299d9e5)